00195655-04_SM_X-Series_FSE_en - 第85页

Service Work 3.5.1 Replacing the E/D Transformer (Colle ctor Ring) - FSE C &P20 Placement Head Service Manual (internal ver sion) SIPLACE HF and X Series 85 Removing the star 1. Hold circuit - vacuum unit 2. Star, co…

100%1 / 112
Service Work
C&P20 Placement Head 3.5.1 Replacing the E/D Transformer (Collector Ring) - FSE
84 Service Manual (internal version) SIPLACE HF and X Series
3.5
3.5 C&P20 Placement Head
C&P20 Placement Head
3.5.1
3.5.1 Replacing the E/D Transformer (Collector Ring) - FSE
Replacing the E/D Transformer (Collector Ring) - FSE
Preparation
NOTICE
The star is not a spare part!
The star is not a spare part and is only removed if the E/D transformer needs to be replaced.
CAUTION
Different E/D transformer used for CP20 / CP20A!
The E/D transformer is used for the C&P20 [03007711-xx].
Only the E/D transformer may be used on the C&P20A of the X4I [03058629-xx]!
Old and new ED transformers
The new E/D transformer [03058629-xx] consists of a
stationary and a rotating part.
Three sliding contacts (5) transmit the direct current
voltage (24V/4A).
The CAN bus signals are transmitted contactless.
Connector (1) to intermediate distributor
A centering pin (2) fixes the stationary part (4) in
place.
The rotating part (3) is fixed to the star carrier with five
screws, which can be loosened via the service open
-
ing (6).
1. Component camera
2. Silencer
3. BE-sensor
4. Z axis
5. Pressure control valve
6. Return unit
Remove the component camera (1).
Remove the silencer (2).
Remove the pressure control valve (5).
Remove the Z axis (4) with return unit (6).
Remove the component sensor (3).
6
1
5
4
3
2
Service Work
3.5.1 Replacing the E/D Transformer (Collector Ring) - FSE C&P20 Placement Head
Service Manual (internal version) SIPLACE HF and X Series 85
Removing the star
1. Hold circuit - vacuum unit
2. Star, complete with E/D transformer
3. Raceway
Remove the hold circuit vacuum unit (1).
You can now access the star (2).
1
3
2
Loosen the 6 fastening screws (2) holding the race
-
way (1).
The raceway is fixed to the Z axis position with pins
(3). Gently lever the raceway off with a suitable
screwdriver.
⇨ The raceway can not be removed and will remain
hanging from the star. Carefully place the raceway
onto the segments.
Loosen the 3 fastening screws (4) holding the star
and carefully lift these out of the star carrier.
⇨ Note the different lengths of the 3 fastening screws
(4). Mark their installation positions.
⇨ The connection cable is long enough to remove
the star and E/D transformer and then disconnect
outside the star carrier.
Disconnect the E/D transformer and place the entire
unit down on a suitable surface.
Pull the smoothed distributor disc (1) off the motor
shaft (3) of the star drive. Take care of the O ring on
the motor shaft.
Make sure that you do not lose the 4 O rings (2) on
the smoothed distributor disc!
Clean the 4 O rings (2) (2 on each side) on the
smoothed distributor disc and grease them slightly
with Unisilikon.
Clean the O ring (3) on the motor shaft and grease
slightly with Unisilikon.
Attach the smoothed distributor disc to the rotary ax
-
is.
2
2
1
4
3
2
3
1
2
Service Work
C&P20 Placement Head 3.5.1 Replacing the E/D Transformer (Collector Ring) - FSE
86 Service Manual (internal version) SIPLACE HF and X Series
Removing the E/D transformer
The upper side of the E/D transformer (2) has a service opening (1), through which you can loosen
the 5 fastening screws. Simply turn the upper section over the individual screws and loosen these in
succession.
Attention:
Do not loosen the index screw (4).
Carefully pull the E/D transformer (2) upwards and out of the connection (6) on the star (5).
⇨ The star has an index screw (4), which enables you to fit the E/D transformer in the correct posi
-
tion.
Fit the E/D transformer (2) so that the index screw is aligned with the groove in the E/D transformer.
⇨ Make sure that the connector (6) engages correctly.
Fix the E/D transformer with the 5 fastening screws, through the service opening (1).
Fitting the E/D transformer
1. Service opening
2. E/D transformer
3. Groove for index screw
4. Index screw
5. Star
6. Connectors
6
1
5
4
3
2
Turn the E/D transformer (2) so that the index screw
(4) is aligned above the groove (3) in the E/D trans
-
former.
Fit the star with E/D transformer (5) carefully with the
pins on the motor shaft into the star carrier.
Attach the connection cable to the E/D transformer
(2).
Fit all the components you removed. Follow the in
-
structions in the relevant sections of this service man
-
ual.
1
5
4
3
2