00194474-0702_AI_HeadReconfig_X_605_DE EN - 第173页

Head Reconfiguration Kits 2 Assemb ly Instructions - SIPLACE X-Series Head Reconfiguration Kits 07/2010 Edition 173 2.10.3 Removing the nozzle st ation (descr iption for the new co mponent trolley docking unit 03015680-0…

100%1 / 276
2 Assembly Instructions - SIPLACE X-Series Head Reconfiguration Kits Head Reconfiguration Kits
07/2010 Edition
172
: Dismantle the nozzle station and the cable clip (see photograph).
2
: Close off the open exit from the T-piece with a plug.
2
Dismantle the nozzle station
and cable clip
T-piece on component trolley docking unit
Head Reconfiguration Kits 2 Assembly Instructions - SIPLACE X-Series Head Reconfiguration Kits
07/2010 Edition
173
2.10.3 Removing the nozzle station (description for the new component trolley
docking unit 03015680-07 with CAN node for tape cutter control board)
2
The component trolley docking unit must be released according to the installation location (single
portal placement area) and pushed outwards.
It is essential to read the respectively valid service manual in this connection.
Fasten the component trolley docking unit in place after completing the work and measure all at-
tachment parts (nozzle changer). 2
2
: Remove the cover plate from the component trolley docking unit.
2
2
2
2
2
2
2
2 Assembly Instructions - SIPLACE X-Series Head Reconfiguration Kits Head Reconfiguration Kits
07/2010 Edition
174
: Disconnect the air hose.
Close the Y piece using a 00330249 plug QSC-4H
.
2
2
: Remove the nozzle station valve completely.
2
2
2
2
2
2
2
2
2
Y adapter
Solenoid valve