00195166-0402_SM_D4_EN - 第238页
Settings Component Handling Setting the COT Basic Height 238 Serv ice Manual SIPLACE D4 6.4 Component Handling 6.4.1 Setting the COT Basic Height 6.4.1.1 T ools and Equipment The following too ls and equipmen t are neede…
Settings
Other Mechanical Settings on the Star C&P12
Service Manual SIPLACE D4
237
Maintenance recommendations:
Use the valve plunger ONLY when greased. (Isoflex topas).
Replacing the valve plunger also means:
– Clean the valve plunger housing! Otherwise good plungers with new grease are installed in the
old, contaminated environment.
– Grease the valve plunger: Use the appropriate tool [03049689-01] to grease the valve plunger.
– Perform vacuum tests with the red SOKO nozzles, vacuum test DLM [03067029-01].
Regularly check the sleeve-nozzle vacuum plate "blue" (available from 10/2008, white) and replace
when necessary (with 1.5mm Allen key).
6.3.13 Other Mechanical Settings on the Star
Set the air blast tube so that it overlaps the circular guide frame by 0.7 mm.

Settings
Component Handling Setting the COT Basic Height
238 Service Manual SIPLACE D4
6.4 Component Handling
6.4.1 Setting the COT Basic Height
6.4.1.1 Tools and Equipment
The following tools and equipment are needed to adjust the height of the component trolley:
Set of Allen keys, size 5
Eyebolt with M12 thread to raise the component trolley table,
DIN 580 M12-St [00048350-xx]
Leverage device for raising the component trolley table, must be able to carry at least 80 kg
6.4.1.2 Adjusting the Component Trolley to the Board Transport Height
6-22: Component trolley with a PCB conveyor height of 950 mm
Legend
Holes drilled for board transport heights 830 -
950 mm in the guidance bars
The component trolley for the S feeder modules
can be easily and quickly adjusted to the following
board transport heights:
830 mm ±15 mm standard height
900 mm ±15 mm SMEMA height
930 mm ±15 mm SMEMA height
950 mm ±15 mm SMEMA height
WARNING:
The component trolley height may only
be set by SIPLACE technicians or
other qualified and officially authorized
(certified) personnel.
X Observe the applicable accident
prevention regulations.
X Remove all feeder modules from the
changeover table plate, before you
adjust the height of the changeover
table.

Settings
Setting the COT Basic Height Component Handling
Service Manual SIPLACE D4
239
6.4.1.3 Adjusting the Component Trolley Height
X Screw the eyebolt into the M12 hole provided (1) on the component trolley table.
X Hook the leverage device into the eyebolt (2).
X Tighten the rope of the leverage device.
X Loosen the 8 hexagon socket-head screws, M6x12 (4).
X Lift or lower the component trolley table to the required height. Make sure that the hole for the
required height in the bridge (5) is level with the top hole in the vertical profile bar (3).
X Fasten the bridge (5) to the vertical profile bar (3) with the 8 hexagon socket-head screws M6x12 (4).
X Unscrew the eyebolt from the component trolley table.
WARNING:
Lift all feeder modules off the component trolley table plate.
6-23: Position of eyebolt on component trolley
Legend
1. M12 hole drilled for eyebolt
2. Eyebolt DIN 580 M12-St
3. Vertical profile bar
4. 8 x hexagon socket-head screw SN 62355,
M6x12
5. Bridge
CAUTION:
Always use the fit-up aid (screwed
eyelet) to fix the table plate,
irrespective of whether you want to
raise or lower the component trolley.