20121120111955_KY8030_2_Maintenance_Manual_Eng_ver1 - 第43页

Maintenance Manual | 43 ② ① ④ ③ 1.2.13. 2D/3D LED C HANGE AND C LEANING Figure 1-14. 2D/3D LED change and cleaning Item Description Item Description 1 3D LED Light 3 2D LED Light 2 Projection Lens 4 Dif fuser 1. Cut  th…

100%1 / 102
42 | KY-8030 2
3DSolderPasteInspectionSystem
Version 1.0
KOH YOUNG TECHNOLOGY INC.
1.2.12. PROBE CHANGE
Figure 1-13. Probe Change
1. Cutthepower/theairsupplyandpressemergencyswitch.
2. Openthe FrontDoor/WindowanddisassembleRearCover/RightSideCover.
3. DisassembleProbeUnitfromXAxis(eliminateConnector)
4. AssemblenewProbeUnittoXAxis(connecttheConnector)
5. SupplypowerandcheckiftheilluminationandPZT
isoperatingproperlyatthemanual
mode.
6. ExecuteCalibrationoftheProbe(refertoProbeCalibrationmanualforthis)
Note:PZTAmpshouldbechangedwhenchangingProbe.
Probe Fixing
Position
Probe
Maintenance Manual | 43
1.2.13. 2D/3D LED CHANGE AND CLEANING
Figure 1-14. 2D/3D LED change and cleaning
Item Description Item Description
1 3D LED Light 3 2D LED Light
2 Projection Lens 4 Diffuser
1. Cutthepower/theairsupplyandpressemergencyswitch.
2. OpentheFrontDoor/WindowanddisassembleRearCover/RightSideCover.
3. DisassembletheConnectorofProbe.
4. Disassemblethe3DLEDLight.
5. Likewise,disassemble2DLEDLight.
6. Assemblyisinreverseorderofdisassembly.
7. Supplypowerand
checkiftheilluminationisoperatingproperlyatthemanualmode.
8. Settheilluminationatthemanualmode(refertotheProbeCalibrationmanualforthis)
9. Moistcleanpaperwithlenscleaningsolvent.
44 | KY-8030 2
3DSolderPasteInspectionSystem
Version 1.0
KOH YOUNG TECHNOLOGY INC.
10. Cleantheprojectionlenscover.
Note: Always check the contamination of lens cover before PCB inspection. The contamination can
causeperformancedeteriorationorerror.