00195376-05_SM_D1_D1i_D2_D2i_EN - 第172页

Service Work Pick&Place Head 4.5.5 Replacing the Ma in Head Board [00352833-xx] 172 Service Manual SIPLACE D1/D1i/D2/D2i Legend 1. Head main bo ard (fitted on the top of the TWIN seg - ment) 2. Fastening screws with …

100%1 / 280
Service Work
4.5.5 Replacing the Main Head Board [00352833-xx] Pick&Place Head
Service Manual SIPLACE D1/D1i/D2/D2i 171
Removal/Installation
4.5.5
4.5.5 Replacing the Main Head Board [00352833-xx]
Replacing the Main Head Board [00352833-xx]
Removal
Remove the P&P head from the machine.
Loosen the two screws (4) fastening the mount at the
side.
Remove the cable ties and unplug the press-fit con-
nection (3).
Unthread the cable as far as the head board (5).
Loosen the screws (2) fastening the incremental en-
coder (1).
Unplug the press-fit connection (3) and extract the in-
cremental encoder (2).
CAUTION! Do not damage the incremental
scale!
The Z axis scale is situated under the incremental encod-
er.
Fit the new incremental encoder so that there is a gap
of 0.4 mm between it and the scale. Use the corre-
sponding thickness gauge (plastic).
Make sure that the mount and the incremental encod-
er are installed parallel to one another. Where neces-
sary, correct the play at the holes (within the
tolerance) and tighten the screws.
Check the track signals.
4
2
5
1
3
2
CAUTION
Digital pressure control valve
The digital pressure control valve needs to be fitted with version [00352833-09] of the head
main board.
NOTICE! Connectors
A number of connectors are unplugged during replace-
ment work. Always mark their original positions so that
these can be easily allocated again when service work is
finished.
Dismantle the relevant segment of the TwinHead.
Loosen the two screws (2) fastening the flat ribbon
cable clamp (1).
Service Work
Pick&Place Head 4.5.5 Replacing the Main Head Board [00352833-xx]
172 Service Manual SIPLACE D1/D1i/D2/D2i
Legend
1. Head main board (fitted on the top of the TWIN seg-
ment)
2. Fastening screws with spacer sleeves under the
board
3. Connectors (2 on gantry, 2 to segment)
Unplug all connectors (3) from the head main board
(1) (2 connectors from the TWIN segment, return cyl-
inder, Z axis incremental encoder).
Loosen the four fastening screws (2). Watch out for
the four spacer sleeves under the board. These can
be grasped and removed with a small Allen key.
Carefully pull the main head board (1) up and off. This
also disconnects the supply plug on the vacuum gen-
erator.
Completely open the connector fixtures on the foil flat
ribbon cableand remove the foil flat ribbon cable(1).
Service Work
4.5.6 Replacing the Control Cable for the DP Unit - Force Sensor [03005289] Pick&Place Head
Service Manual SIPLACE D1/D1i/D2/D2i 173
Installation
4.5.6
4.5.6 Replacing the Control Cable for the DP Unit - Force Sensor [03005289]
Replacing the Control Cable for the DP Unit - Force Sensor [03005289]
Overview
Connect the foil flat ribbon cable completely into the
connector (contacts must be fully covered) and fix the
connector strain relief.
Carefully connect the new head main board (1). This
also reconnects the vacuum generator.
Fit the fastening screws (2) with the spacer sleeves.
Reestablish all connections to the electricity supply
(3).
Fit the Twin segment again.
CAUTION
Transfer the machine data to the EPROM!
Transfer the machine data from the station to the intermediate distributor.
Follow the instructions in "6.6.13 Transmitting the Head-Specific Data (from SW601)"
[ ➙ 260].
Legend
1. Control cable for DP unit/force sensor
2. Flat ribbon mount
3. Main head board
4. Force measuring board
Remove the P&P head from the machine.
1
4
3
2