AltaPail II Bulk Melters Product Manual - 第170页
Repair 10-8 Part 1121836_03 E 11/2014 Nordson Corporation This page intentiona lly left blank.

Repair
10-7
Part 1121836_03
E 11/2014 Nordson Corporation
Replacing Control Panel
You must purchase Service kit P/N: 394734. You will need the following
tools:
S
Electrical cabinet key
S
Open-end or box wrench, size 7
WARNING: Risk of electrical shock. Failure to observe may result in
personal injury, death, or equipment damage.
Installing Service Kit
WARNING: Disconnect the bulk melter from the line voltage.
1. Set the main switch to 0/OFF and Open electrical cabinet door.
2. Unplug bus cable from old control panel.
3. Release the M4 hexagon nuts and remove with the tooth lock washers.
4. Press old control panel and old seal forwards and out of the electrical
cabinet door.
5. Insert the new control panel and secure it using the tooth lock washers.
6. Plug bus cable into new control panel and then close the electrical
cabinet door.
7. Simultaneously turn on the main switch and hold down the key Heater
and the platen icon on the control panel until the LEDs on the control
panel light up once.
NOTE: When a new control panel has been installed, the following step
must be performed the next time the system is switched on:

Repair
10-8
Part 1121836_03
E 11/2014 Nordson Corporation
This page intentionally left blank.

Parts
11-1
Part 1121836_03
E 11/2014 Nordson Corporation
Section 11
Parts