00193802-01 - 第182页

Index User Manual SIPLACE CF 06/2003 US Edition 182 load per unit ar ea on moun ting feet 77 locatio n 1 67 locatio n 3 67 lock out pr ocedu re for the pl acement sy stem 60 M mach ine conc ept 68 mach ine key 21 mach in…

100%1 / 188
User Manual SIPLACE CF Index
06/2003 US Edition
181
12 mm S for capacitors based on powdered me-
tal, model E
145
12/16 mm S
143
24/32 mm S
146
3 x 8 mm S
141
3x8mm S feeder for 0201/0402 CO
142
44 mm S
147
56 mm S
148
72 mm S
149
8 mm S II
140
88 mm S
150
bulk case feeder
152
linear vibratory feeder, type 3
151
fine-pitch camera
67, 97
component range
97
field of vision
97
max. component dimensions
97
method of illumination
97
min. lead pitch
97
technical data
97
fuses
112
fuses, electrical
74
G
gantry
87
position
87
gantry 1
87
gantry 1 with PCB camera
67
gantry arm
88
general operating statuses
135
general, user manual
14
ground clearance of the placement system
77
guard
53
cover
47
slots for adjusting the height
47
guard (adjustable)
47
guard on the component table locations
53
guard, adjusting
47
H
handling ESD modules
64
hazard symbols, conventions
19
head mount
88
height of the placement system
77
hole for power cable
72
I
indicator lamps
83
input conveyor
109
inserting the dividing plates
into the component trolley tape container
123
inserting the feeder
153
inserting the tape into the used tape cutter
161
installation
172
ISO/DIS 8573-1
74
J
JEDEC / CENELEC waffle-pack trays
172
K
key switch
82, 84
key switch closed
48
key switch open
48
keyboard
82, 84
key-operated switch
46
position 0 for normal operation
48
position I for service purposes
48
L
laser class 1
38
laser class 1M
38
laser classification
38
of the whole machine
38
length of the placement system
77
liability of the manufacturer/supplier
17
line concept
71
modules
71
overview
71
PCB conveyor
71
PCB format
71
peripherals
71
range of components
71
space required
71
system
71
technical data
71
line engineer
16
line engineer profile
118
linear vibratory feeder, type 3
151
load per unit area on foundation
77
Index User Manual SIPLACE CF
06/2003 US Edition
182
load per unit area on mounting feet
77
location 1
67
location 3
67
lock out procedure for the placement system
60
M
machine concept
68
machine key
21
machine overview - technical data
70
magazine carriers
control groove
167
driving groove
167
transport direction
167
main power filter Z1
59, 72
main power supply
checking
112
main power switch
49, 58, 59, 82, 84
main switch switched off
placement system disconnected ...
59
system connected
59
malfunctions in the feeder
125
manual tray
172
max. placement rate
6-segment Collect&Place head
70
Pick&Place head
70
maximum oil content, compressed air
74
measures to protect against static charging
64
measuring unit, servo unit
58
middle tape reel for 3x 8 mm feeders
adapter plate
159
tape reel holder
159
monitor
82, 84
N
noise emission, maximum
74
noise emissions
74
notes
on environmentally-friendly disposal of materi-
als and components
23
on operational safety
20
nozzle changer for the 6-segment Collect&Place
head
99
base
105
capacity of the reject bin
99
carrier
100
centering hole
105
changing the magazine
105
dimensions
99
discarding defective nozzles
101
emptying the reject bin
104
hole for the parallel pin for centering the maga-
zines
102
hole for the parallel pin of the slide mechanism
102
locking plate
102
magazine
100
mode of operation
100
notes on operation
103
nozzle changer - position detection
106
nozzle discarding device
100
nozzle holder
102
nozzle types
99
number of nozzle holders
99
overview
99
picking up a nozzle
101
pneumatic circuit
99
position of the nozzles in the magazine
106
positioning fiducial
102, 106
reject bin
100
reject bin, capacity
104
remove the reject bin
104
retaining clamp
105
setting down a nozzle
101
slot
105
slot for the parallel pin for centering the magazi-
nes
102
special magazines
101
spring hook
105
technical data
99
time required to open and close the locking pla-
te
99
nozzle changer for the Pick&Place head
175
capacity
176
clean
178
countersunk screw
177
magazine 1 (standard)
177
magazine 2 to 4 (optional)
177
magazine for 5 nozzles
175
notes on operation and maintenance
178
nozzle changeover time
176
nozzle holder
177
nozzle removal tool
178
nozzle types
176
User Manual SIPLACE CF Index
06/2003 US Edition
183
overview
175
positioning fiducial
177
reject bin
175, 177
support plate
175
technical data
176
O
operating panel on the PCB input side
83
operating panel on the PCB output side
83
operating pressure
74
operating system
70
operator
16
operator panel, input side
80
emergency stop button
80
indicator lamps
80
keyboard with trackball
80
main power switch
80
monitor
80
start button (white)
80
stop button (black)
80
operator panel, output side
81
component barcode reader
81
component counter
81
emergency stop button
81
key-operated switch
81
start button (white)
81
station computer
81
stop button (black)
81
original spare parts
22
output conveyor
109
overview of the 6-segment Collect& Place head with
standard component camera
90
P
particle density, compressed air
74
particle size, compressed air
74
PCB camera
analysis time per fiducial
98
fiducials
98
field of vision
98
image processing
98
library size
98
method of illumination
98
structure
98
technical data
98
PCB camera (standard camera)
98
PCB changeover time
70
PCB conveyor
67
automatic width adjustment
108
bad fiducial detection
108
clearance on PCB underside
108
component-free PCB handling edge
108
PCB changeover time
108
PCB format
108
PCB thickness
108
PCB transport height
108
PCB warpage
108
stationary conveyor side
108
type of interface
108
PCB format
70
PCB thickness
70
peripherals
71
personnel profile
117
line engineer
118
operator
117
programmer
119
service engineer
118
personnel, qualified
16, 19
Pick&Place head
67, 70, 93
angular accuracy
70
description
94
DR axis drive
93
fine-pitch camera
93
placement accuracy
70
sleeve
93
structure
93
technical data
94
Z axis drive
93
pick-up position for components
127
pick-up window
121
pivoting bracket
83
placement heads
90
placement procedure
70
placement system, setting up the
109
points for attaching the fork-lift truck
109
position of the compressed air unit
56
potentially lethal voltages
73
power failure
74, 112
power supply connection for component trolley
72
power supply connection for WPC
72
power supply for control unit
58
preliminary set-up of the placement station
125