00195094-0202-MM-D3_EN - 第16页

4 Maintenance schedule SIPLACE D3 08/2008 US Edition 16 4 months Apply film of grease to running surface of the st ar brak e ISOFLEX TOP AS, NCA 52 Segment s Clean the segment s Ethyl alcohol, cotton wool buds Remove dir…

100%1 / 98
SIPLACE D3 4 Maintenance schedule
08/2008 US Edition
15
Month Clean the glass disk of the IC camera Lens cloth
Clean the glass disk of the FC camera Lens cloth
Clean the coplanarity module (if present) Lens cloth
2 months Inspect or replace the pneumatic unit Drip tray, replace compressed air
filter
, if
required
Check / replace the intake filt
er
for cooling the Y
motor, if required
New intake filter, if required
Inspect or replace the silencer New silencer, if required
Clean TwinHead sleeve and nozzle seating Teflon spray, lint-free cloth
Maintain the component feeder table (S feeder
mod
ule
s)
Vacuum cleaner, whetstone,
scissors, lint-free cloths, WD40
Grease the plunger pins of the component trolley
do
cking
unit and of the ODU connector (S feeder
modules)
Brush,
UNISILKON L250L
Vacuum the felt filter for the axis
unit / control unit,
replace, if required
Vacuum cleaner,
new felt filter, if required
Check the filter element 40 µm New filter element, if required
4 months C&P 6 / 12 placement head
Z axis
Remove dirt from the toothed belt Brush
Clean the rollers, toothed wheels and toothed belt Lint-free cloths
Check the toothed belt for wear
Grease the toothed belt Short-bristled brush, ISOFLEX
T
O
PAS NCA 52
Check the Z axis guide
Check the jaws and the ball race for damage
Oil the Z axis ball race Oil dispenser with Structovis GHD
Star / distributor plate
Wipe the star and the distributor plate Lint-free cloths
Interval Location Equipment / spare parts Done
(date)
4 Maintenance schedule SIPLACE D3
08/2008 US Edition
16
4 months Apply film of grease to running surface of the star
brak
e
ISOFLEX TOPAS, NCA 52
Segments
Clean the segments Ethyl alcohol, cottonwool buds
Remove dirt from around the segments Ethyl alcohol, cottonwool buds
Valve casing
Clean the valve casings and their environment Ethyl alcohol, cottonwool buds
Distributor
Clean and grease the O-rings UNISILKON L250L
Check the distributor for damage
Wipe the distributor Ethyl alcohol, lint-free cloths
Blow air through the distributor Compressed air
Check that the ball catches run easily
Star brake
Check the star brake for damage and to ensure it is
wo
rkin
g correctly
Wipe the star brake / remove grease Lint-free cloths
Fill the holes with grease ISOFLEX TOPAS, NCA 52
Apply film of grease to surface of the star brake ISOFLEX TOPAS, NCA 52
Distributor seat
Clean the distributor seat Ethyl alcohol, lint-free cloths
Valve adjustment drives
Wipe the valve adjustment drives Lint-free cloths
Clean the locating disk and the gap Lint-free cloths
Clean the ball bearings Lint-free cloths
Check that the ball bearings are working correctly
Remove visible dirt
Interval Location Equipment / spare parts Done
(date)
SIPLACE D3 4 Maintenance schedule
08/2008 US Edition
17
4 months
Turning station
Clean the locating disk
Wipe the black O-ring Ethyl alcohol, l
i
nt-free cloths
Check the O-ring for damage
Check the toothed belt for damage
Clean the stop faces
Vacuum generator
Clean the Venturi nozzles Ethyl alcohol, l
i
nt-free cloths
Blow air through Venturi nozzles Compressed air
Grease the O-rings UNISILKON L250L
Clean and blow air through the vacuum generator
blo
c
k
Ethyl alcohol, cottonwool buds
Silencer
Clean holes to the Venturi nozzles Ethyl alcohol, cottonwool buds
Check for dirt
Check the plastic mount for breaks
TwinHead
Clean/check supplementary volume filter Compressed air
Clean the scale Ethyl alcohol, lint-free cloth
Conveyor width adjustment
Adjust conveyor width adjustment
Year Clean and preserve the PCB conveyor SIPLACE cleaning tissue
Check the PCB conveyor mechanics
Clean the fixing strip (PCB conveyor) Ethyl alcohol, lint-free cloth
Function test of used tape cutter Sheet of paper, adhesive tape
Grease the gantries for the X and Y axes Grease gun,
Klüberplex BEM 34-132
Interval Location Equipment / spare parts Done
(date)