80S-2080F480F4-680F5 User’s Manual - 第396页
SIPLACE 80S- 20/F4/F4-6/F5 User’s Manual 6 What should you do ... ? Edition 03/98 from Software Vers ion SR.404.xx 6.1 W hen you switch on the SIPLACE line 6 - 5 Fig. 6. 1.2 Flow chart: "Switching on the SIPLACE lin…

6 What should you do ... ? SIPLACE 80S-20/F4/F4-6/F5 User’s Manual
6.1 When you switch on the SIPLACE line Edition 03/98 from Software Version SR.404.xx
6 - 4
PLEASE NOTE:
During the transfer of data from the line computer to the station computer, make sure that the red “Stop pro-
cessing“ button lights up (see point A in Fig. 6.1.1)
Fig. 6.1.1 Main view menu - prompt to start the automatic placement machine
After the prompt appears on screen, press one of the round green start buttons on the input or output side.
The "State“ row on the screen shows the action that has just been carried out.
The "Action“ row immediately beneath it (with a green background) contains the actions that you should
carry out.
Once the approach to the reference point has ended, the automatic placement system is ready for service.
6.1.3 Flow chart: switching on the SIPLACE line
The following flow chart shows the actions of the line computer, automatic placement system and operator
while the SIPLACE line is being switched on and starting up.
A

SIPLACE 80S-20/F4/F4-6/F5 User’s Manual 6 What should you do ... ?
Edition 03/98 from Software Version SR.404.xx 6.1 When you switch on the SIPLACE line
6 - 5
Fig. 6.1.2 Flow chart: "Switching on the SIPLACE line“
Test set-up
Reset tracks
No
Line computer tasks
Load cluster data
Fiducials
OK?
Make settings on the machine
Set-up generator appears
Check the set-up
(insert feeder modules)
Switch on
Nozzle check
Change nozzle
configuration, if necessary
Wait for PCB
Introduce PCB
Track
Yes
Abort
placement
No
PCB onto ourput conveyor
Yes
Station computer
Bold :
Italic :
To be carried out
by the operator
Carried out and
signaled by
the machine
Confirm the set-up generator

6 What should you do ... ? SIPLACE 80S-20/F4/F4-6/F5 User’s Manual
6.2 When you switch off the SIPLACE line Edition 03/98 from Software Version SR.404.xx
6 - 6
6.2 When you switch off the SIPLACE line
ATTENTION
Before you switch off the line ALWAYS make sure that:
– All the placement and gluing operations at the stations have ended.
– The z-axes of all placement and adhesive heads are in the top end position.
– None of the placement heads still contain components.
– All of the gantries have moved into the standby position.
– The station computers are shut down safely.
6.2.1 Switching off the line computer
CAUTION
NEVER just switch the line computer off at the power switch.
ALWAYS shut down the operating system. Otherwise you will almost certainly lose a lot of data or corrupt the
programs and you may have to reinstall the line computer software.
Position the mouse at the top or bottom right edge of the screen. The cursor will change into a cross.
Hold down the left mouse button. The main menu will appear on screen.
Move the mouse cursor onto ’Shutdown’ and then release the mouse button. The following dialog box will
appear on screen:
Click on ’Yes’. The dialog box will close and the software will shut down. This operation takes around 1
minute.The following box will then appear:
Switch off the UPS and monitor.
Shut down the computer
Yes No
Safe to Power Off
Press any key to reboot