00196851-02 OG SIPLACE Operation of X and SX-Series with SSC (SW70x) - 第10页
10 Inhaltsverzeichnis 13.3 Important Factors for Keeping th e Line Running 138 13.4 DPM,MFR, Scrap Ra te 140 14 703-Refilling Feeders 141 14.1 Refilling Feeders 141 14.2 Refilling Feeder 142 14.3 Online Track Verificatio…

Operator Guide SIPLACE Operation of X and SX-Series with SSC
Inhaltsverzeichnis
9
11 703-GUI Overview 123
11.1 PCB Information 123
11.2 PCB being Processed - Running Mode 124
11.3 Light Towers 125
12 Refilling Component Reels 127
12.1 Refill a track 127
12.2 Splicing - Required Tools and Materials 128
12.3 Preparation of carrier tape end 129
12.4 Preparation of new carrier tape 130
12.5 Splicing the carrier tape 131
12.6 Splicing the carrier tape 132
12.7 Splicing of wide carrier tapes 133
12.8 Checking the splice 134
12.9 After Splicing 135
12.10 Cleaning Tasks 136
13 703 Running the line – Important Factors 137
13.1 Most Important Factor for Keeping the Line Running 137
13.2 Line Downtime 138

10
Inhaltsverzeichnis
13.3 Important Factors for Keeping the Line Running 138
13.4 DPM,MFR, Scrap Rate 140
14 703-Refilling Feeders 141
14.1 Refilling Feeders 141
14.2 Refilling Feeder 142
14.3 Online Track Verification 143
14.4 Refill Completed 144
15 Option 703 MTC Refill 145
15.1 Refilling MTC 145
15.2 Refill the MTC 146
15.3 Loading the new tray. 147
15.4 Refill the Trays 148
15.5 Refill a MTC tray 149
15.6 MTC Refill Completed 150
16 Option 703 WPC refill 151
16.1 Refilling the WPC 151
16.2 Refilling the WPC 152
16.3 Refilling the WPC 153

Operator Guide SIPLACE Operation of X and SX-Series with SSC
Inhaltsverzeichnis
11
16.4 Refilling the WPC. 154
16.5 WPC fill completed. 155
16.6 Refill a WPC tray 156
16.7 WPC fill completed. 157
17 703-Handling Messages 159
17.1 GUI Messages 159
17.2 Messages - Current 160
17.3 Message Detail 161
17.4 Messages - Statistics 162
17.5 Messages – Statistics – Location 1 163
18 Weekly PM (70x) 165
18.1 Preparations for Maintenance – Materials 165
18.2 Preparations for Maintenance – block the Line 166
18.3 Preparations for Maintenance – stop production. 167
18.4 Preparations for Maintenance – vacuum test 168
18.5 Preparations for Maintenance – vacuum test 169
18.6 Head vacuum test 170
18.7 Head vacuum test - graph 171
18.8 Return the nozzles to the nozzle changer 172