00196851-02 OG SIPLACE Operation of X and SX-Series with SSC (SW70x) - 第106页
SW 703 Option WPC - Correct pla cement of Carrier in Unit : 106 Correct place ment of Carrier i n Unit 1. Carriers with correct place ment will show a consistent straight tape line running di agonally fr om top left to r…

SW 703 Option WPC - Loading Of Carrier :
105
Loading Of Carrier
Loading the carrier involves three steps:
1. Push in the refilled carrier
2. Turn the latch inward to secure the carriers
3. Close the transparent acrylic door

SW 703 Option WPC - Correct placement of Carrier in Unit :
106
Correct place ment of Carrier i n Unit
1. Carriers with correct placement will show a consistent
straight tape line running diagonally from top left to
right bottom
2. A distorted line indicates that some carriers are at the
wrong level
Note: Wrongly positioned carrier will result in wrong
component being picked up.

SW 703 Option WPC - Loading Position Of The Carrier :
107
Loading P osition Of The Carrier
1. Check if all carriers are loaded into the WPC with the
correct edge (Cut) facing inward
Note: A crash may occur if the above step is not followed.