00196851-02 OG SIPLACE Operation of X and SX-Series with SSC (SW70x) - 第118页
SW 703 Option WPC - Checks when loading the WPC. : 118 Checks whe n loading the WPC. The tabl e to the l eft lists t he key points that you should check at the WPC when preparing a product to run at the line.

SW 703 Option WPC - WPC verification :
117
WPC verification
The WPC setup verification can be carried out separately
for each location.
1. Check and see if the setup is displayed as online
setup in Setup Center.
2. Scan the control barcode Table verification of the
location to be verified. Check if you at the right track.
3. Scan all configured barcodes of the packaging unit.
Repeat step 4 until all the necessary tracks for the
current job are verified.
NOTICE! Depending on the configuration of
Setup Center further steps can be necessary during
online setup verification. Therefore always watch the
display of the barcode reader.
e.g. scanning of user or reordering a packaging unit.

SW 703 Option WPC - Checks when loading the WPC. :
118
Checks when loading the WPC.
The table to the left lists the key points that you should
check at the WPC when preparing a product to run at the
line.

SW 703 Prepare the line – Important Factors - Most Important Factors for Prepare the Line :
119
SW 703 Prepare the line – Impor tant Factors
DPM = Defects per million – a measure of how many parts are misplaced or not placed at all.
MFR = Material Failure Rate – how many PCBs fail at test.
Most Important Factors – DPM, MFR, Scrap Rate
Results – Lower Quality, Rework Costs, Higher Production Costs
Tasks that can cause quality Problems
Loading incorrect parts onto feeders / MTC
Operations Success Measures
Number of incorrect parts loaded / product start up.
Operations Target
Zero incorrect components loaded!