Operator Guide SIPLAC E Operation of X and SX-Series with SSC Inhaltsverzeichnis 7 8.1 Option - MTC 85 8.2 Numberin g System O f Levels (T owers 1 & 2) 86 8.3 Numberin g System O f Levels (T owers 1 & 2) 87 8.4 R…

6
Inhaltsverzeichnis
6.2 Changing of Table – Stop Production 68
6.3 Changing of Table – move gantry. 69
6.4 SIPLACE SX – remove table 70
6.5 SIPLACE X – remove table 71
6.6 Changing of Table - remove 72
6.7 SIPLACE SX – reload table 73
6.8 SIPLACE X – reload table 74
7 SW 703 Downloading a Recipe 75
7.1 LC GUI – Most Important Buttons 75
7.2 Download of a Recipe. 76
7.3 Download Complete. 77
7.4 Change conveyor width – remove support pins. 78
7.5 Successful Recipe Sent 79
7.6 Unsuccessful Recipe Send 80
7.7 Changing the nozzle changer setup. 81
7.8 Changing the nozzle changer configuration. 82
7.9 Nozzle changer setup is complete. 83
7.10 Online Setup Verification 84
8 SW 703 Option MTC 85

Operator Guide SIPLACE Operation of X and SX-Series with SSC
Inhaltsverzeichnis
7
8.1 Option - MTC 85
8.2 Numbering System Of Levels (Towers 1 & 2) 86
8.3 Numbering System Of Levels (Towers 1 & 2) 87
8.4 Removal Of Carriers for both Towers 88
8.5 Loading Of Carrier for both Towers 89
8.6 Loading Position Of The Carrier (Tower 1) 90
8.7 Loading Position Of The Carrier (Tower 2) 91
8.8 Magnets Under The Carrier 92
8.9 Locking Of The Leaf Springs (Towers 1 & 2) 93
8.10 Filling MTC 94
8.11 Set Up Sheet for MTC 95
8.12 Filling the MTC 96
8.13 Moving to the Refill position 97
8.14 Refill Completed 98
8.15 MTC verification 99
8.16 Checklist for MTC Preparation. 100
9 SW 703 Option WPC 101
9.1 Option WPC 101
9.2 Condition Of The Carrier 102
9.3 Numbering System Of Level 103

8
Inhaltsverzeichnis
9.4 Removal Of Carrier 104
9.5 Loading Of Carrier 105
9.6 Correct placement of Carrier in Unit 106
9.7 Loading Position Of The Carrier 107
9.8 Magnets Under The Carrier 108
9.9 Filling the WPC 109
9.10 Filling the WPC 110
9.11 Filling the WPC 111
9.12 Setup Sheet for WPC 112
9.13 Filling the WPC 113
9.14 Filling the WPC. 114
9.15 WPC fill completed. 115
9.16 WPC fill completed. 116
9.17 WPC verification 117
9.18 Checks when loading the WPC. 118
10 SW 703 Prepare the line – Important Factors 119
10.1 Most Important Factors for Prepare the Line 119
10.2 DPM,MFR, Scrap Rate 120
10.3 Important Factors for Prepare the Line 121
10.4 Reject Rate 122