00196851-02 OG SIPLACE Operation of X and SX-Series with SSC (SW70x) - 第8页

8 Inhaltsverzeichnis 9.4 Removal Of Carrier 104 9.5 Loading Of Carrier 105 9.6 Correct placement o f Carrier in Un it 106 9.7 Loading Position Of The Carrier 107 9.8 Magnets Under The Carri er 108 9.9 Filling the WPC 109…

100%1 / 198
Operator Guide SIPLACE Operation of X and SX-Series with SSC
Inhaltsverzeichnis
7
8.1 Option - MTC 85
8.2 Numbering System Of Levels (Towers 1 & 2) 86
8.3 Numbering System Of Levels (Towers 1 & 2) 87
8.4 Removal Of Carriers for both Towers 88
8.5 Loading Of Carrier for both Towers 89
8.6 Loading Position Of The Carrier (Tower 1) 90
8.7 Loading Position Of The Carrier (Tower 2) 91
8.8 Magnets Under The Carrier 92
8.9 Locking Of The Leaf Springs (Towers 1 & 2) 93
8.10 Filling MTC 94
8.11 Set Up Sheet for MTC 95
8.12 Filling the MTC 96
8.13 Moving to the Refill position 97
8.14 Refill Completed 98
8.15 MTC verification 99
8.16 Checklist for MTC Preparation. 100
9 SW 703 Option WPC 101
9.1 Option WPC 101
9.2 Condition Of The Carrier 102
9.3 Numbering System Of Level 103
8
Inhaltsverzeichnis
9.4 Removal Of Carrier 104
9.5 Loading Of Carrier 105
9.6 Correct placement of Carrier in Unit 106
9.7 Loading Position Of The Carrier 107
9.8 Magnets Under The Carrier 108
9.9 Filling the WPC 109
9.10 Filling the WPC 110
9.11 Filling the WPC 111
9.12 Setup Sheet for WPC 112
9.13 Filling the WPC 113
9.14 Filling the WPC. 114
9.15 WPC fill completed. 115
9.16 WPC fill completed. 116
9.17 WPC verification 117
9.18 Checks when loading the WPC. 118
10 SW 703 Prepare the line – Important Factors 119
10.1 Most Important Factors for Prepare the Line 119
10.2 DPM,MFR, Scrap Rate 120
10.3 Important Factors for Prepare the Line 121
10.4 Reject Rate 122
Operator Guide SIPLACE Operation of X and SX-Series with SSC
Inhaltsverzeichnis
9
11 703-GUI Overview 123
11.1 PCB Information 123
11.2 PCB being Processed - Running Mode 124
11.3 Light Towers 125
12 Refilling Component Reels 127
12.1 Refill a track 127
12.2 Splicing - Required Tools and Materials 128
12.3 Preparation of carrier tape end 129
12.4 Preparation of new carrier tape 130
12.5 Splicing the carrier tape 131
12.6 Splicing the carrier tape 132
12.7 Splicing of wide carrier tapes 133
12.8 Checking the splice 134
12.9 After Splicing 135
12.10 Cleaning Tasks 136
13 703 Running the line – Important Factors 137
13.1 Most Important Factor for Keeping the Line Running 137
13.2 Line Downtime 138