HS50_advance_level 1_20200522_221201 (1) - 第114页

06/2002 E dition Studen t Guide H S-50 Advance d I 5 DLM1 C&P H ead 22 5.2.8 Pick up 7th c o mpo n ent F ig. 5. 2 - 7 P ick up 7th c o mpon en t – V ision syst e m: componen t on segment 1 of the gantry is cen tered …

100%1 / 567
Student Guide HS-50 Advanced I 06/2002 Edition
5 DLM1 C&P Head
21
5.2.7 Pick up 6th component
Fig. 5.2 - 6 Pick up 6th component
Vision system:
no action
Dp-station:
turn nozzle 10 to Pick up angle
pick up / placement station:
pick up 6th component
synchronization:
communication with MVS for the optical centering of component´s. Access to the MVS is given
to the „picking gantry“.
12
1
1
1
0
9
8
7
6
5
1
2
3
4
Star position
Digit: 60.000
Angle: 150 °
06/2002 Edition Student Guide HS-50 Advanced I
5 DLM1 C&P Head
22
5.2.8 Pick up 7th component
Fig. 5.2 - 7 Pick up 7th component
Vision system:
component on segment 1 of the gantry is centered
Dp-station:
turn nozzle 11 to Pick up angle
pick up / placement station:
pick up 7th component
Star position
Digit: 72.000
Angle: 180 °
1
2
1
1
10
9
8
7
6
5
1
2
3
4
Student Guide HS-50 Advanced I 06/2002 Edition
5 DLM1 C&P Head
23
5.2.9 PCB position recognition run to the PCB nominal position
PCB position recognition with gantry 4(placement area 1) and gantry 2(placment area 2) is
done after the 7th component is picked up and nozzle 11 is turned to the pick up the angle.
The gantry axes move the PCB camera to the theoretical fiducial position. The camera takes
the picture of the fiducial and the vision system calculates the center position.
The centered fiducial define now the actual position of the board.
The camera takes the picture of the fiducial and the vision system calculates the center posi-
tion of this picture.
The 2nd calculation is the deviation between nominal and calculated fiducial position.
All board fiducials are optically centered with this procedure.
This data is sent to the machine controller
The correction values are calculated for the X, Y and the angular position of the PCB .
Now the gantry axes move the placement head to the next pick up position
5.2.10 Pick up 8th component
Fig. 5.2 - 8 Pick up 8th component
Vision system:
component on segment 2 of this gantry is centered
Dp-station:
turn nozzle 12 to Pick up angle
pick up / placement station:
pick up 8th component
Star position
Digit: 84.000
Angle: 210 °
1
2
11
1
0
9
8
7
6
5
1
2
3
4