HS50_advance_level 1_20200522_221201 (1) - 第454页

S tud ent Guid e HS-50 A dvanced I 0 6/2002 E dition 12 Pr eventive Maintenance 21 Y ou will need the follo wing tools an d consum ables f or the week ly ma intenance ta sks: – V acuum cleaner –W a s t e b i n –B r u s h…

100%1 / 567
06/2002 Edition Student Guide HS-50 Advanced I
12 Preventive Maintenance
20
12.6 Maintenance work every week
12
12
Student Guide HS-50 Advanced I 06/2002 Edition
12 Preventive Maintenance
21
You will need the following tools and consumables for the weekly maintenance tasks:
Vacuum cleaner
–Waste bin
–Brush
Scissors
Soft, lint-free cloths
Ethyl alcohol
Magazine with cleaned ceramic nozzles or new nozzles.
There must be no PCBs in the placement system during the following maintenance steps.
: Select "Block manually" (status closed) on the station computer and click on Accept (or Track
1 / Track 2 for the dual conveyor).
Wait until the last PCB is complete and has left the placement system.
The working area is now clear.
: Press the Stop button.
: Open the protective cover.
12
Take hold of the handle and carefully move the gantry. Do not use too much force.
: Push the gantry over the component table. This will leave your working area clear.
Clean PCB conveyor / sonar BEROs
a Clean the sonar BEROs thoroughly using the vacuum cleaner.
s Use a suitable vacuum cleaner nozzle to remove any loose components from the sonar BERO
unit.
d Use the vacuum cleaner to remove any loose components from all around the PCB conveyor.
Loose components in the PCB conveyor or sonar BERO unit could cause malfunctions.
12
12
06/2002 Edition Student Guide HS-50 Advanced I
12 Preventive Maintenance
22