M4serviceManual_e - 第12页

1 Installation 1-4 ■ How to Hoist Use the bolts, wires, and the arm as the foll owing diagram shows. NOTE: Be sure to use the arm to preven t the wire from touching the machine. Bolt Front View Arm Side View Arm

100%1 / 96
1 Installation
1-3
How to Hoist the Machine
Be sure to use the bolts when hoisting the machine.
Recommended Bolt Size
Type 1 (M30 x P3.5)
Type 2 (M30 x P3.5)
Type M×P D d d1 L L2 L3 S T R H B C
1 30×3.5 36 68 -- 131 30 56 48 22 3 16 22 25.6
2 30×3.5 36 68 88 141 40 56 48 22 3 16 22 25.6
[Unit = mm]
1 Installation
1-4
How to Hoist
Use the bolts, wires, and the arm as the following diagram shows.
NOTE: Be sure to use the arm to prevent the wire from touching the machine.
Bolt
Front View
Arm
Side View
Arm
1 Installation
1-5
Production Line
To align your assembly line, first install the heaviest unit. Then install peripheral units using the first unit as
a reference.
Reference
Loader     Mounter     Reflow Oven   Conveyor Unloader
To transfer the PCB (printed circuit board) smoothly, clearance between units are quite important. Be sure
that the clearance between units is approximately 5 mm as below figure shows. Adjust the height of the
downstream unit a little lower (0-0.5 mm) so that the PCB is transferred smoothly.
0 - 0.5mm
Approx. 5mm
DownstreamUpstream