0019797 3 - 10 / 02 , 2016 Structu re SIPLACE Mat. Towe r St ora ge Serv ice Manual © ASM 10 -5 Step 4 Insert the new cel l plate in direction as shown on the picture. Insert t he two b lack knobs to f asten it. Step 5 R…

Structure 00197973-10 / 02 , 2016
10-4 © ASM SIPLACE Mat. Tower Storage Service Manual
Step 2
Cover the area below the cell plate with sheets
to prevent littering SIPLACE Material Tower with
drilling splinters.
Step 3
Drill completely through both blind rivet nuts.
Afterwards, the cell plate can be removed.
At the back of the plate, the two endings of the
blind rivet nuts were cut and fell down on the
ground. Make sure both of them are removed
from
the inside of SIPLACE Material Tower.

00197973-10 / 02 , 2016 Structure
SIPLACE Mat. Tower Storage Service Manual © ASM 10-5
Step 4
Insert the new cell plate in direction as shown on
the picture. Insert the two black knobs to f
asten
it.
Step 5
Remove the cover sheets and clean the whole machine and surroundings by means of the vacuum
cleaner. Make sure no drilling splinters are present.
Remove all tools, attach all previously removed covers and close the doors of the machine.
Plug in the power connector and switch on the machine.
Initialize the machine by means of the software.
Step 6
In the software, in
System - Storage
Devices/Units
select the appropriate machine in
the table and press
Load.
In tab
Stacks calibrate the stack where the cell
plate has been exchanged.