00197973-10_SM_MaterialTower - 第221页
0019797 3 - 10 / 02 , 2016 Option Air Dryer SIPLACE Mat. Towe r St ora ge Serv ice Manual © ASM 11 -7 Step 4 Mount the drain cover below the a i r dryer. No exac t pos ition is req uired . If no holes are p repared. Dril…

Option Air Dryer 00197973-10 / 02 , 2016
11-6 © ASM SIPLACE Mat. Tower Storage Service Manual
Step 3
The air dryer is mounted above the electronics.
No exact position is required. Let approximately
300 mm distance between the air dryer and the
beginning of the plate.
If there are no holes prepared on the electric
plate, drill the holes with 4mm diameter
according to the holes in the holding plate. Of
the air dryer.
Fit the air dryer by screwing in the screws from
the back side.

00197973-10 / 02 , 2016 Option Air Dryer
SIPLACE Mat. Tower Storage Service Manual © ASM 11-7
Step 4
Mount the drain cover below the air dryer. No
exact position is required.
If no holes are prepared. Drill 2.5mm holes and
use a 3mm th
read cutter.
ATTENTION: Make sure the screws are not
too long. At the back side they must not
overlap 2mm
Step 5
Mount the magnetic valve abo
ve the air dryer.
No exact position is required.
If no holes are prepared. Drill 2.5mm holes and
use a 3mm thread cutter.
ATTENTION: Make sure the screws are not
too long. At the back side they mustn't
overlap 2mm

Option Air Dryer 00197973-10 / 02 , 2016
11-8 © ASM SIPLACE Mat. Tower Storage Service Manual
Step 6
• PU Hose 4 mm
• PU Hose 8 mm
• PU Hose 15 mm
Connect hoses as showed on picture.
Step 7
Place hoses in direction to the electronics plate
as shown in the picture.