General 0019797 3 - 10 / 02 , 2016 2-4 © ASM SIPLACE Mat. Tower S tor ag e Service Ma nual Loose n the f ive screws that are ret aining the belt tensioner. Turn the belt t ension nut a ccordingly to achieve the correct t…

100%1 / 274
00197973-10 / 02 , 2016 General
SIPLACE Mat. Tower Storage Service Manual © ASM 2-3
2.1.4 Exchange and setup steps
X Belt
Push the X axis to the a distance where you can
measure
600 mm between the beginning of the
belt holding and the middle of the pulley.
Required tension for the X belt is
35 Hz ± 1 Hz.
Be aware that a new belt is setup to 36 Hz.
Measure the belt tension approximately in the
middle of the measuring distance.
If the tension is outside the limits, proceed
with the setup steps below, else go to the
next axis.
Loosen the rigid coupling by loosening the
screw.
General 00197973-10 / 02 , 2016
2-4 © ASM SIPLACE Mat. Tower Storage Service Manual
Loose
n the five screws that are retaining the belt
tensioner.
Turn the belt tension nut accordingly to achieve
the correct tension.
00197973-10 / 02 , 2016 General
SIPLACE Mat. Tower Storage Service Manual © ASM 2-5
Fasten the five screws that are retaining the belt
tensioner.
Fasten the screw of the coupling using a torque
key adjusted on 2.5 Newton.