00197973-10_SM_MaterialTower - 第89页

0019797 3 - 10 / 02 , 2016 Z Axis SIPLACE Mat. Towe r St ora ge Serv ice Manual © ASM 6-7 6.1.4 Exchange steps Step 1 Note: To prevent the Y axis from f alling down, pull i t down to the bottom. Loose n the screw of the …

100%1 / 274
Z Axis 00197973-10 / 02 , 2016
6-6 © ASM SIPLACE Mat. Tower Storage Service Manual
6.1.3 Prerequisites
For a safe and efficient maintenance, the following prerequisites have to be fulfilled:
Personnel:
Any work with or at the equipment must be carried out by skilled and
trained personnel in accordance with the locally applicable
regulations.
Inform all involved persons regarding the currently running
maintenance works.
Machine loading:
All stored items must be unloaded in advance.
Machine operating
condition:
Shut down
Main electrical
power:
Equipment disconnected from power supply system. The Main Switch
(switched off) locked by means of a padlock to secure the main switch
against unintentional switching on.
Compressed air /
Nitrogen (if used):
Equipment disconnected from compressed air or nitrogen supply.
Access:
Open both doors of the machine.
Pull the Z axis towards you.
Push the gripper down as far as possible (is a bit hard because the Z
motor has a break).
00197973-10 / 02 , 2016 Z Axis
SIPLACE Mat. Tower Storage Service Manual © ASM 6-7
6.1.4 Exchange steps
Step 1
Note:
To prevent the Y axis from falling down,
pull it down to the bottom.
Loosen the screw of the coupling on the motor
side.
Step 2
Cut all cable ties and disconnect all cables.
Z Axis 00197973-10 / 02 , 2016
6-8 © ASM SIPLACE Mat. Tower Storage Service Manual
Step 3
Remove the old motor by means of the four
fixation screws. Mount the new motor in the
same direction as the old one.
Step 4
Reconnect all cables and fixate them with cable
ties as shown in the picture.
Step 5
Fasten the screw of the coupling using a torque
key adjusted on 7 Newton.