M20_Ope_E - 第29页

Chapter 1 General 1-11 Rear view Note: When CTF-40 is not used, but CFB-36 is used on the rear of the mounter, insert the short-circuit connector into the connector for CTF-40 Signal & Power. Connector for CTF-40 Sig…

100%1 / 518
Chapter 1 General
1-10
1-1-2 Connector Panel
M10
Front view
CN1
(Signal connector
for post-process)
CN2
(Signal connector
for pre-process)
Air regulator
1. Main Switch
Vacuum gauge
LAN port
Chapter 1 General
1-11
Rear view
Note: When CTF-40 is not used, but CFB-36 is used on the rear of the mounter, insert the short-circuit connector
into the connector for CTF-40 Signal & Power.
Connector for CTF-40
Signal & Power
Air socket for CTF-40
Chapter 1 General
1-12
M20
Front view
CN1
(Signal connector
for post-process)
CN2
(Signal connector
for pre-process)
Vacuum gauge
1. Main Switch
LAN port
Air regulator