M20_Ope_E - 第30页

Chapter 1 General 1-12 M20 Front view CN1 (Signal connector for post-process) CN2 (Signal connector for pre-process) Vacuum gauge 1. Main Switch LAN port Air regulator

100%1 / 518
Chapter 1 General
1-11
Rear view
Note: When CTF-40 is not used, but CFB-36 is used on the rear of the mounter, insert the short-circuit connector
into the connector for CTF-40 Signal & Power.
Connector for CTF-40
Signal & Power
Air socket for CTF-40
Chapter 1 General
1-12
M20
Front view
CN1
(Signal connector
for post-process)
CN2
(Signal connector
for pre-process)
Vacuum gauge
1. Main Switch
LAN port
Air regulator
Chapter 1 General
1-13
Connector for CTF-40
Signal & Power
Air socket for CTF-40
Rear view
Note: When using the CFB-36 instead of using the CTF-40 on the rear of the mounter, plug the shorting
connector into the “Connector for CTF-40 Signal & Power.”