M20_Ope_E - 第31页
Chapter 1 General 1-13 Connector for CTF-40 Signal & Power Air socket for CTF-40 Rear view Note: When using the CFB-36 instead of using the CTF-40 on the rear of the mounter, plug the shorting connector into the “Con…

Chapter 1 General
1-12
M20
Front view
CN1
(Signal connector
for post-process)
CN2
(Signal connector
for pre-process)
Vacuum gauge
1. Main Switch
LAN port
Air regulator

Chapter 1 General
1-13
Connector for CTF-40
Signal & Power
Air socket for CTF-40
Rear view
Note: When using the CFB-36 instead of using the CTF-40 on the rear of the mounter, plug the shorting
connector into the “Connector for CTF-40 Signal & Power.”

Chapter 1 General
1-14
1-1-3 Alarm Beacon (option)
Alerts the operator to various machine states visually.
Machine State Beacon State Beep
(High-pitched tone)
Green
Yellow
Red White*
Run Running Lights
Pausing Lights
Error Blinks
continuous
Out of component Blinks
intermittent
Component shortage
Lights
Blinks
Manual
/Teach
Normal Lights
Error Lights
Blinks
continuous
Others
(Pause)
Normal Lights
Error Blinks
Lights continuous
* The white light is optionally available.
* Alarm beacon status for component exhaustion/shortage can be changed in User Parameter.