MACHI NE PRE PARAT ION MACHINE LEVELLING Chapter Issu e 3 Jun 01 Installati on Manua l 5.19 Initial Le v elling When the correct he ight of the machine has been achiev ed, the four feet should no w be adjusted for correc…

MACHINE PREPARATION
MACHINE LEVELLING
5.18 Installation Manual Chapter Issue 3 Jun 01
MACHINE LEVELLING
General Before operation, the machine must be installed at the correct height and level.
Machine Height The height of the machine is governed by the external machines it is to be
connected to and ranges from 840mm to 980mm (depending if the feet exten-
sions are fitted). The height is measured from the floor to the top of the transport
belts, Machine Height figure below refers.
NOTE
To achieve reliable DEK SPC testing and Cp/Cpk results, the securing arrange-
ment of the four machine legs must be correct in accordance with the Mounting
Feet Arrangement diagram, (Major Relocation chapter - Unpacking section).
This arrangement increases the rigidity of securing the feet to the frame.
Figure 5-10 Machine Height
Height to Top of
Transport Belts
840mm to 980mm
View on Front of Machine
Transport Belts
Cutaway to
Show Belt

MACHINE PREPARATION
MACHINE LEVELLING
Chapter Issue 3 Jun 01 Installation Manual 5.19
Initial Levelling When the correct height of the machine has been achieved, the four feet should
now be adjusted for correct level.
1. Place an engineering level on the tooling base plate facing Left (L) - Right
(R) or Back (B) - Front (F).
2. By carefully adjusting each of the four feet individually, level the machine
so that in each direction, Left (L) - Right (R) and Back (B) - Front (F), 0.004"
per foot (0.32mm/metre) is achieved.
3. Lock the feet using the locknuts on the adjusters.
Check that the machine height has not been disturbed. If machine height
requires further adjustment, carry out Machine Height and Machine Levelling
until the correct machine height and level is achieved.
Figure 5-11 Machine Levelling
Isometric View Showing Levelling of Tooling Base Plate
Tooling Base Plate
Engineering Level
Adjustable Mounting Feet
(4 positions)

MACHINE PREPARATION
SHOCK WATCHES
5.20 Installation Manual Chapter Issue 3 Jun 01
SHOCK WATCHES
A self adhesive resettable shock watch (DEK Part No. 133517), is fitted in the
vertical plane on the machine in four places (Shock Watch Locations figure
refers).
Check if the shock watches have been triggered, the indicator shows red, ('Drop
N Tell' Shockwatch figure overleaf refers).
NOTE
The machine should be fitted with four untriggered shock watches at all times.
Figure 5-12 Shock Watch Locations
Machine PC Machine Controller
Camera
Chase
NOTE
Shock Watches (4 positions)
shown circled