ELA Installation.pdf - 第48页

MACHI NE PRE PARAT ION SHOCK WATCHE S 5.22 Installati on Manua l Chapter Iss ue 3 Jun 01

100%1 / 90
MACHINE PREPARATION
SHOCK WATCHES
Chapter Issue 3 Jun 01 Installation Manual 5.21
Figure 5-13 Drop N Tell Shockwatch
Chase Shock
Watch
If the chase shock watch has triggered, visually inspect the chase is level to the
table.
Camera Shock
Watch
If the camera shock watch has triggered, ensure that the camera is secure and
level on the camera mount (refer to Technical Reference Manual).
Machine PC Shock
Watch
If the machine PC shock watch has triggered, visually inspect the inside of the
PC and ensure that the cards are seated correctly.
Machine
Controller Shock
Watch
If the machine controller shock watch has triggered, visually inspect the machine
controller to ensure that the cards are seated correctly.
Shock Watch
Replacement
On completion of corrective action, replace any triggered shock watches.
NOTE
The machine should be fitted with four untriggered shock watches at all times.
MACHINE PREPARATION
SHOCK WATCHES
5.22 Installation Manual Chapter Issue 3 Jun 01
POWER UP SEQUENCE
GENERAL
Chapter Issue 3 Jun 01 Installation Manual 6.1
CHAPTER 6 POWER UP SEQUENCE
GENERAL
Before the machine is powered up, a final check is required to ensure proper
installation. When fully satisfied that all instructions and preparations have been
carried out as detailed in Chapter 5 - Machine Preparation, proceed with the
power up checks detailed in this Chapter.
Electrical Services Check the following electrical services are available:
The machine transformer must be tapped to the nearest selectable voltage within
the following limits:
100V, 110V and 120V ±5%
200V, 210V, 220V, 230V and 240V ±2.5%
CAUTION
VOLTAGE CONFIGURATION. The factory set voltage configuration
may differ from the customers own supply.
- Ensure correct transformer configuration is used
- Ensure that the machine serial plate is annotated correctly
- Ensure filtration unit (if fitted) is voltage compatible
NOTE
Refer to Technical Reference Manual, Power Supply and Distribution chapter
for detailed information. Chapter 5 - Machine Relocation of this manual for
filtration unit information.
Detail Voltage
Measured Customer/Factory electrical supply
Detail Voltage Accept
Check dispatch documentation and serial number plate on rear
of machine matches supply