ELA Installation.pdf - 第8页

MANU AL CHAN GE RE QUEST F ORM Installati on Manua l CUSTOMER USE Date Originator Name & Department Position Compan y Te l e p h o n e Fax Email Machine Model Number Software V ersion Serial Number Manual T itle Chap…

100%1 / 90
MANUAL INFORMATION
Installation Manual
MANUAL INFORMATION
Quality Manager
DEK Printing Machines Ltd
11 Albany Road
Granby Industrial Estate
Weymouth
Dorset
DT4 9TH
England
Tel: +44 1305 760760
Fax: +44 1305 760123
INFORMATION IN THIS MANUAL IS SUBJECT TO CHANGE WITHOUT
NOTICE.
NO PART OF THIS MANUAL MAY BE REPRODUCED, TRANSMITTED
IN ANY FORM OR MEANS, ELECTRONICALLY OR MECHANICALLY,
INCLUDING PHOTOCOPYING AND RECORDING, FOR ANY PURPOSE
WITHOUT THE EXPRESS WRITTEN PERMISSION OF DEK PRINTING
MACHINES LTD.
EVERY EFFORT HAS BEEN MADE DURING THE COMPOSITION OF
THIS MANUAL TO ENSURE THAT THE INFORMATION HAS BEEN
CLEARLY PRESENTED AND CORRECT IN ALL RESPECTS.
IF DURING THE USE OF THIS MANUAL, ERRORS OR OMISSIONS
ARE FOUND, OR THE READER CONSIDERS THAT IMPROVEMENTS ARE
NECESSARY TO OVERCOME ANY AMBIGUITY OR INACCURACIES,
A OF THE MANUAL CHANGE REQUEST FORM SHOULD BE
COMPLETED AND EITHER FAXED OR FORWARDED TO THE ADDRESS
BELOW, ACCOMPANIED WITH A OF THE RELEVANT PAGE
AND/OR FIGURE OF THE MANUAL WITH THE RECOMMENDATION.
COPY
COPY
MANUAL CHANGE REQUEST FORM
Installation Manual
CUSTOMER USE Date
Originator Name & Department
Position
Company
Telephone
Fax
Email
Machine Model Number
Software Version
Serial Number
Manual Title
Chapter
Chapter / Figure
Details of Change
Attachments
DEK USE No.
Accepted No Reason
Yes Priority Immediate
Next Release
Details of Change
Manuals Affected Name
Date Signature
INTRODUCTION
GENERAL
Chapter Issue 3 Sept 00 Installation Manual 1.1
CHAPTER 1 INTRODUCTION
GENERAL
To prevent damage to the machine whilst unpacking or during machine power
up it is essential to read and adhere to the procedures and sequences detailed in
the Installation Manual and to ensure the correct method of unpacking and
assembly of the machine, machine preparation and power up sequences are
carried out prior to the normal running operations of the machine.
Authorized
Personnel
Only DEK authorized personnel may carry out the procedure detailed in this
document.
Chapter 2 Safety Features, describes the features on the machine that provide operator
safety whilst the machine is in operation.
Chapter 3 Services Required, describes the services needed for the machine to function
correctly. A view of the service panel showing the external connections to the
services and positioning of the circuit breakers is also shown.
Chapter 4 Unpacking Instructions, describes the method of dismantling and unpacking the
transit boxes, checking the machine, loose items and documentation. Checking
the machine configuration against customer requirements, assembling the loose
items to the machine and transportation of the machine to its designated area.
Chapter 5 Machine Preparation, describes the method of transporting the machine into
position, removal of transit brackets, fitting the external services, adjusting the
height and levelling the machine in preparation for machine power up.
Chapter 6 Power Up Sequence, describes the sequence of machine power up and checking
of home sensor positions, system calibrations and settings, and new product
setup using a test board.
Chapter 7 External Machine Interface, describes the procedure for interfacing the screen
printer to external machines (such as a placement machine) and DEK ancillary
equipment, and checking the functionality of the machine.
Chapter 8 Machine Performance, details the method of checking the machine performance
with the customers board for alignment.
Chapter 9 Installation Documentation, describes the installation and acceptance documen-
tation that accompanies the machine.