00198442-01_UM_TX-V2_EN - 第245页
User manual SIPLACE TX V2 5 Tasks at the placement machine From software version 711.1 04/2018 5.12 Changing the setup 247 5.12 Changing the setup 5.12.1 Printing out the conversion inst ructions before changing the setu…

5 Tasks at the placement machine User manual SIPLACE TX V2
5.11 Observing displays on the feeder module From software version 711.1 04/2018
246
5.11.2 Status display
–Green:
The feeder module is on standby and is contained in the current setup.
– Orange:
A warning is being signalized.
– Red:
A malfunction has occurred.
–Off:
The feeder module is not in the current setup.
5
5
5
PLEASE NOTE
"LED off" only for feeder modules contained in the setup
The placement machine controller switches off the status display of any feeder modules
not included in the setup.
The "LED off" status only occurs when the programming system has preset a job on the
line. This takes some of the work away from the operator since he only has to watch
those feeder modules that are contained in the setup.
PLEASE NOTE
Setup procedure: Activation of LED for each feeder module
For the actual setup process - no setup information at the station, no job sent from SI-
PLACE Pro to the station/line - the LED on each feeder module is activated after the set-
up has been made. The operator is thus informed whether everything is OK.

User manual SIPLACE TX V2 5 Tasks at the placement machine
From software version 711.1 04/2018 5.12 Changing the setup
247
5.12 Changing the setup
5.12.1 Printing out the conversion instructions before changing the setup
Before a change of setup, print out the conversion instructions on the printer for the SIPLACE Pro
computer as described in the "SIPLACE Pro" manual or in the online help.
5.12.2 What you should note when changing the feeder modules
Handle the feeder modules carefully when you insert them into or remove them from the
changeover table. Make sure that the X feeder modules do not bump against the centering
bar (see item 5 in fig. 5.10 - 3
, page 238) of the changeover table.
Vacuum the supporting surfaces of the feeder modules and clean the surface of the table
when necessary according to the instructions in the preventive maintenance manual.
Remove loose components using a brush or a vacuum cleaner with a suitable nozzle.
5
CAUTION
Risk of injuries!
Fine metal splinters from components could injure hands.
Avoid removing components from the changeover table with your fingers.

5 Tasks at the placement machine User manual SIPLACE TX V2
5.13 Avoiding track errors From software version 711.1 04/2018
248
5.13 Avoiding track errors
5.13.1 General
Make sure that the areas around the feeder modules are clean and that there are no loose
components in the infeed area or under the feeder modules.
Refill promptly with components.
Splice the tapes early. This generally means that you are to prepare the splicing material
when there is still approximately 1.5 m of tape on the reel.
Handle the feeder modules carefully when you insert them into or remove them from the
changeover table as these are high-precision devices.
For X feeder modules, lower the pickup window since it can easily be damaged or cause other
damage when raised.
5
Check that the pick-up position is set correctly for the components on the feeder modules.
Check whether the separating plates have been correctly inserted.
PLEASE NOTE
A raised pick-up window leads to noticeably impaired pick-up quality.