N7201A652E - 第170页

NPM- TT2 EJM1EE-MB-02 O-04 ACTIVATION ACTIVATION 2-5-7 -1 1 After removing PCBs 2 3 Cover the line camera with the lint-free cloth Individu- al prepara- tion Installing suppor t pins (f or automa tic c hange) 1 Operating…

100%1 / 512
NPM-TT2 EJM1EE-MB-02O-04
1
2
1
2
Select whether to place or not
on a head by head basis
: place
: Do not place
2
1
2
1
3
3
Select a target to cancel
2-5-6-6
You can select multiple buttons and
clear them all at once.
Selecting the head
Deselecting the head
Preparation
NPM-TT2 EJM1EE-MB-02O-04
ACTIVATION
ACTIVATION
2-5-7-1
1
After removing
PCBs
2 3
Cover the line
camera with the
lint-free cloth
Individu-
al
prepara-
tion
Installing support pins (for
automatic change) 1
Operating procedure
2-5-7
Installing the support pin (for automatic change) 1
The PCB support block
raises.
Detach the tray
feeder or the feeder
cart
For a tray feeder
(→[Maintenance] P.14-8)
For a feeder cart
(→[Maintenance] P.3-2)
OFF
SERVO
5
4
7
6
Fold the feeder
table cover to
the back
Only for the exchange cart
Only for the exchange cart
Only for the exchange cart
NPM-TT2 EJM1EE-MB-02O-04
2-5-7-2
8
Detach the PCB support block (for automatic change)
Removal lever
Draw out the PCB support block (for automatic change).
Draw it out slowly with both hands.
Be careful not to drop a foreign body on
the line camera (LED lighting) or bump it.
Remove both lane as the same way.
Lift up the right and left levers in the front.
Removal lever
To
9
PCB support block
(for automatic change)
Preparation