N7201A652E - 第170页
NPM- TT2 EJM1EE-MB-02 O-04 ACTIVATION ACTIVATION 2-5-7 -1 1 After removing PCBs 2 3 Cover the line camera with the lint-free cloth Individu- al prepara- tion Installing suppor t pins (f or automa tic c hange) 1 Operating…

NPM-TT2 EJM1EE-MB-02O-04
1
2
1
2
Select whether to place or not
on a head by head basis
: place
: Do not place
2
1
2
1
3
3
Select a target to cancel
2-5-6-6
You can select multiple buttons and
clear them all at once.
Selecting the head
Deselecting the head
Preparation

NPM-TT2 EJM1EE-MB-02O-04
ACTIVATION
ACTIVATION
2-5-7-1
1
After removing
PCBs
2 3
Cover the line
camera with the
lint-free cloth
Individu-
al
prepara-
tion
Installing support pins (for
automatic change) 1
Operating procedure
2-5-7
Installing the support pin (for automatic change) 1
●The PCB support block
raises.
Detach the tray
feeder or the feeder
cart
●For a tray feeder
(→[Maintenance] P.14-8)
●For a feeder cart
(→[Maintenance] P.3-2)
OFF
SERVO
5
4
7
6
Fold the feeder
table cover to
the back
●Only for the exchange cart
●Only for the exchange cart
●Only for the exchange cart

NPM-TT2 EJM1EE-MB-02O-04
2-5-7-2
8
Detach the PCB support block (for automatic change)
Removal lever
●Draw out the PCB support block (for automatic change).
●Draw it out slowly with both hands.
●Be careful not to drop a foreign body on
the line camera (LED lighting) or bump it.
●Remove both lane as the same way.
●Lift up the right and left levers in the front.
Removal lever
To
9
PCB support block
(for automatic change)
Preparation