N7201A652E - 第195页
NPM- TT2 EJM1EE-MB -03O-02 3-2-1 -2 Production G D E F A B C H L I E F A B C H J K I J K L A bottleneck machine position can be displayed in yellow color in the following position by LNB setting . LNB setting Display…

NPM-TT2 EJM1EE-MB-03O-02
Produc-
tion
informa-
tion
How to check the screen in
production when stationary
1
How to check the screen in production 1
●Displays production information and operation status during production.
Operating procedure
3-2-1
3-2-1-1
A
E
B
C
D
F
PCB
The number of produced PCBs/patterns.
Switches the display of time required to
produce a PCB. (Display changes every
time you pressed)
●Cycle time 1
Time from when clamping is completed
before placement until clamping is
released after placement.
●Cycle time 2
Placement time including transfer time.
Rate
Operating rate of the machine.
(Changeable by action parameter)
MntPoints
The number of components that
have been placed/total placement
points.
Stop production after the produced
current PCB. (→P.3-1-2)
Component empty / Component
empty warning
Component empty occurrence condition.
G
Transfer Status
The transfer status and current
position of PCBs are displayed.
H
Warning
Errors and warnings on the
machine are displayed.
or
:Blue…Action status
:Yellow…Standby
Waiting for loading
Waiting for unloading
: 0% to 20% or less
: 20% to 40% or less
: 40% to 60% or less
: 60% to 80% or less
: 80% up to 100%
●
●
●
●
●
1
Choose either by machine or by line
: By machine
: By line
1
■Placement head (alternate mode)

NPM-TT2 EJM1EE-MB-03O-02
3-2-1-2
Production
G
D EFA B C
H
L
I EFA B C
H
J
K
I
J
K
L
A bottleneck machine position can be
displayed in yellow color in the following
position by LNB setting
.
LNB setting
Display area
By machine
By lane
M N
M
N
L
M
■By machine
■By line
Number of planned PCBs
Estimated end time
Achievement rate
Actual performance in line / Planned PCBs in line
Machine No.(name) to be
connected
Cycle time
Production status
Display color Production status
Green In production
Yellow Under suspended
Gray
Waiting for component
supply
Blue Waiting for processing
■Display position of bottleneck machine
About the setting of LNB, see the [LNB]
operating instructions.
Upper level: Lane 2
Lower level: Lane 1
Upper level: Lane 2
Lower level: Lane 1

NPM-TT2 EJM1EE-MB-03O-02
Produc-
tion
informa-
tion
How to check the screen in
production when stationary
2
How to check the screen in production 2
Operating procedure
3-2-1
3-2-1-3
O
O
Lane selection
■Independent mode
To start production in front and
rear lanes:
To start production only in lane 1:
To start production only in lane 2: