N7201A652E - 第311页

NPM- TT2 EJM1EE-MB-04 O-03 4-2-3 -6 Setting change 11 + (Meas ure all measurement coordinates and the result is displayed.) Confirm the PCB exists and the message 12 + ■ If you do not operate ) (Remain as it is in ) 11 1…

100%1 / 512
NPM-TT2 EJM1EE-MB-04O-03
4-2-3-5
+
(Measure the selected measurement
coordinates and four points around it,
and the result is displayed.)
8
9
(Move to the next measurement point)
1
2
3
4
5
1.5mm
1.5mm
Confirm the difference between the
measurement point (center) and its
surrounding is 0.03mm or less
If the measurement result is unstable
Adjust to be applicable position with
inching, and measure surroundings again.
(Adjust as a boundary of a copper foil is
not included within 1.5mm)
+
Confirm all points
If you change the measurement
coordinates in the step , you are
asked whether or not to save the
changed coordinates.
Select either one.
8
10
If you change the measurement
coordinates in the step , you are
asked whether or not to save the
changed coordinates.
Select either one.
8
Produc-
tion data
teaching
PCB warpage measurement
point teach
(option) 2
Operating procedure
4-2-3
Teaching procedure 2
8 9
10
NPM-TT2 EJM1EE-MB-04O-03
4-2-3-6
Setting
change
11
+
(Measure all measurement coordinates
and the result is displayed.)
Confirm the PCB exists and the
message
12
+
If you do not operate)
(Remain as it is in )
11
11
13
14
12
Difference:
The difference between measured
value and correction value
13
Measured value:
The difference between the perfect PCB
top surface and the measured PCB top
surface (If the measured PCB top surface
is higher than perfect one, it displayed as
positive value)
Correction value:
The same coordinate value of the
correction curve calculated from the
measurement result
If the difference exceeds 0.3mm, it
results in error, the background in the
frame turns in yellow. For obtaining
the applicable correction curve,
review the measurement points. Also,
if the measured value or correction
value is -4.5mm or less, or +2mm or
over,, it results in error.
:Transitions to the screen
11
13
NPM-TT2 EJM1EE-MB-04O-03
4-2-3-7
Teaching procedure 3
Produc-
tion data
teaching
PCB warpage measurement
point teach
(option) 3
Operating procedure
4-2-3
15
14
14
Displays the PCB warpage condition
15
Press any other menu button and
confirm the message
+
When you do not unload the PCB
Displays only when LNB is connected.
Z
Y
X
Front
The graph is as seen from the front
+