N7201A652E - 第338页
NPM- TT2 EJM1EE-MB-04 O-03 4-2-9 -2 Produc- tion data teaching Placement coor dina tes teac h 2 Operating procedure 4-2-9 Measurement method Button Comp onent Electrode on the PCB One point Two points Four points Choosin…

NPM-TT2 EJM1EE-MB-04O-03
4-2-9-1
Setting
change
Produc-
tion data
teaching
Placement coordinates
teach 1
Generally mount check must be performed before production. It is necessary to edit the data by performing
mount coordinates teaching in any of the following conditions;
●visually check a mounted PCB and mount displacement will be found
●check coordinates of PCB hole and component pin before mounting such as PGA
Choosing a teaching mode
■Mount
Because the position of a certain component is displaced, edit the mount position.
■Mount/Pattern
Because the same position of a component on multifaceted PCBs is displaced, edit the mount
position.
Mount position
Mount data
■Origin offset
Because the mount positions of all components are displaced to the same direction, edit the
mount positions.
Mount position
Mount data
●Before teaching, make sure the data registered in the machine is correct.
●Keep the data properly after teaching to use the data for the production data.
NOTICE
Operating procedure
4-2-9
●Origin offsets that teaching has been
performed are all reflected to all
components
Mount position
Mount data

NPM-TT2 EJM1EE-MB-04O-03
4-2-9-2
Produc-
tion data
teaching
Placement coordinates
teach 2
Operating procedure
4-2-9
Measurement
method
Button Component Electrode on the PCB
One point
Two points
Four points
Choosing a measurement position
Measures the selected position to calculate the center coordinates of a component or an electrode on the PCB.
■Setting screen of the measurement position
■Measurement method and position button
Measure 1
Measure 3
Center
Measure 1
Measure 3
Center
Measure 2
Measure 4
Measure 2
Measure 4
Measure 2Measure 3
Measure 1Measure 4
Tape flow direction
+
-
+
-
+
-
+
-
+
-
+
-
Tape flow direction
Tape flow direction
Tape flow direction
Tape flow direction
Measure 2
Measure 3
Measure 1Measure 4
Tape flow direction

NPM-TT2 EJM1EE-MB-04O-03
4-2-9-3
Setting
change
1
2
Set a PCB on the PCB entrance
1
Choose a teaching mode
●
The description below
assumes to be chosen
●Perform on both and .
Teaching with component (measuring method: 1 point) 1