N7201A652E - 第350页

NPM- TT2 EJM1EE-MB-04 O-03 Produc- tion data teaching Placement coor dina tes teac h 8 Operating procedure 4-2-9 4-2-9 -14 T eaching with component (measuring method: 4 point) 1 Perform steps f rom to in [T eaching w ith…

100%1 / 512
NPM-TT2 EJM1EE-MB-04O-03
Setting
change
4-2-9-13
NPM-TT2 EJM1EE-MB-04O-03
Produc-
tion data
teaching
Placement coordinates
teach 8
Operating procedure
4-2-9
4-2-9-14
Teaching with component (measuring method: 4 point)
1
Perform steps from to
in [Teaching with component
(measuring method: 1 point)]
1
7
2
3
+
,
,
4
When components are placed
on the PCB to
5
,
5
+
Align the cross line to the top of the
component.
Align the cross line to the edge
of a component
See the step of [Teaching with
component (measuring method: 2 point)]
6
5
6
5
Perform on both and .
2
3
When components are not
placed on the PCB to
7
NPM-TT2 EJM1EE-MB-04O-03
Setting
change
4-2-9-15
7
+
Align the cross line to the top of the
component electrode.
Align the cross line to an
electrode on the PCB
8
See the step of [Teaching with
component (measuring method: 2 point)]
7
+
8
Repeat three times steps from
to
4 8
9
If measurement is ,
Perform steps from to ,
changing from [Top] to [Right].
5 7
If measurement is ,
Perform steps from to ,
changing from [Top] to [Bottom].
5 7
If measurement is ,
Perform steps from to ,
changing from [Top] to [Left].
5
7
10
Perform steps from to
in [Teaching with component
(measuring method: 2 point)]
10 13
7