N7201A652E - 第8页

NPM- TT2 EJM1EE-BP-04N-01 S-8 Prepara- tions before production Pr epar a tions of the tr ay feede r 1 Operating pr ocedure 2-3-1 Operating pr ocedure 2-4-2 2-4- 2 -1 ■ About reference Ti t l e Major classificatio n numbe…

100%1 / 512
NPM-TT2 EJM1EE-BP-02N-01
S-7
placement change
Organization of Manuals
Preparation and how to
use
Operating Procedure
Describes overall operating
procedure from production
preparation including material
setting to data configuration and
modification.
Required checks and
cleaning
Maintenance
Describes contents of regularly
required checks, adjustments
and cleaning including
procedures to exchange
consumable parts.
Getting help
Troubleshooting
Describes errors or problems
that may occur on the equipment
and associated
countermeasures.
Please note that contents of this manual are
subject to change without notice.
Other manuals (separate volumes)
Related Documentation
Parts List (Mechanical
and Electrical wiring)
Wiring Diagram
Above manuals are included depending on your
machine optional configuration.
See each manual for details.
Production Modular
LNB
Multifunctional transfer unit
Component verification
option (wired/ wireless)
PanaCIM Material
Verification
(Server-less type)
Message board
Head Diagnosis
Automatic changeover
Host communication
Support station
Component supply
navigator
APC System
Pre-Pickup Inspection
Function
Pre-Pickup Inspection
Editor
NPM-TT2 EJM1EE-BP-04N-01
S-8
Prepara-
tions
before
production
Preparations of the
tray feeder 1
Operating procedure
2-3-1
Operating procedure
2-4-2
2-4-2-1
About reference
Title
Major classification
number
Middle classification number
Minor classification
number
Middle classification title
Minor classification title
When followed by
the same title
Easy-to-find Titles / Tag headlines/ Page number
Reference number
Majormiddleminor
classification number
When multiple pages
have the same title
Symbol to show reference
Major classification
title
Tag headlines
Page number
Preparation
(P.2-3-1)
How to read operating instructions… 1
NPM-TT2 EJM1EE-BP-04N-01
SERVO
ON
1 2 3
Detach the
feeder cart.
(P.3-2)
Shows to turn in the
direction of the arrow.
Operation switch
Contents of operation
Operating procedure
Operation button
S-9
Shows to push another switch or button
while holding down the ACTIVATION
switch.
(Position of switches may vary)
Indicates to draw out to
the arrow direction.
Visual procedure/operation by reading