N7201A652E - 第94页
NPM- TT2 EJM1EE-MB -02O-04 2-2-2 -3 Pickup information Displays informatio n on operating time per stage. Displays up to 50 emergen cy stop errors in chrono logical order, with the most recent first. Stop history Display…

NPM-TT2 EJM1EE-MB-02O-04
2-2-2-2
Continuous preparation
Controls individual preparation before production, per process.
Handles files; for example, loading machine data and saving machine
parameters.
File operation
Displays machine data at each nozzle position.
Material
preparation
Preparation
menu
Nozzle
Displays production data and the
feeder status in color.
Checks feeder status.
Checks the correction values
obtained from pickup position learning
during production, per feeder address.
Feeder
Operates the transcription unit.
(displayed when the transcription unit is mounted)
Checks production data and the tray
status in color.
Checks tray status.
Checks the correction values
obtained from pickup position learning
during production, per tray address.
Tray
Replaces the PCB support pin unit.
Displays PCB positions, and transfers
PCBs from their respective positions.
Adjusts PCB widths.
Calculates the consumption of components relative to the planned volume in
advance.
Production plan
Checks the number of support pins
(for automatic change) and their
positions. (displayed for the support
pin automatic change specification)
Preparation
Conveyor
First layer Second layer Third layer Fourth layer

NPM-TT2 EJM1EE-MB-02O-04
2-2-2-3
Pickup
information
Displays information on
operating time per stage.
Displays up to 50 emergency stop errors in chronological
order, with the most recent first.
Stop history
Displays the latest 50 errors in the vacuum sensor that
occurred during automatic operation in chronological order.
History
Pickup monitor
Displays component pickup
information.
Operating
information
Vacuum sensor error history
Production
information
menu
Displays component pickup
information.
Operator mode 2
Compo-
nent
names
Menu configuration 2
Operating procedure
2-2-2
First layer Second layer Third layer Fourth layer

NPM-TT2 EJM1EE-MB-02O-04
Maintenance
operations
Consumable parts replacement
Periodic inspection
Checks the inspection items and work history of each cycle.
Displays the consumable parts replacement information.
Accuracy verification result
Displays accuracy verification results.
Maintenance
menu
XY unit
Carries out maintenance operations on XY unit.
Head
Carries out maintenance operations on heads.
Carries out maintenance operations on PCB transfer.
Tray
Carries out maintenance operations on the tray feeder.
(Displayed when the tray feeder is installed)
NOTICE
You can handle of the first layer in the customized Operator mode.
2-2-2-4
Preparation
Conveyor
First layer Second layer Third layer Fourth layer