User Manual SIPLACE Linear Dipping Unit 2 X - 第71页

4 Operation 4.11 Starting a reference run User Manual SIPLACE Linear Dipping Unit 2 X 05/2020 71 4.11 Starting a reference run NOTICE Target group: standard operator The procedure described is a regular task that can be …

100%1 / 90
4 Operation
4.10 Positioning the LDU and logging on
70 User Manual SIPLACE Linear Dipping Unit 2 X 05/2020
4.10 Positioning the LDU and logging on
NOTICE
Target group: standard operator
The procedure described is a regular task that can be carried out by any trained operator.
NOTICE
Positioning the LDU on the correct track
Position the LDU on the track of the changeover table which you defined during setup
(see chapter 4.1.1
"Setting up the LDU" [}39]).
Place the LDU 2 X horizontally in the track
of the changeover table.
.
Push the LDU 2 X forward against the
fixed stop of the track.
The LDU 2 X will be automatically locked,
switched on and logged on at the machine.
4 Operation
4.11 Starting a reference run
User Manual SIPLACE Linear Dipping Unit 2 X 05/2020 71
4.11 Starting a reference run
NOTICE
Target group: standard operator
The procedure described is a regular task that can be carried out by any trained operator.
After logging on, it is mandatory to perform a reference run so that the LDU can be set up and
used. During the reference run the axes are initialized. In the process, the end positions of the axes
are determined and moved to a defined position.
Requirements:
The squeegee must be positioned over the park plate at the rear fixed stop.
If required, push the squeegee manually over the park plate to the rear fixed stop.
In the station software, select the Setup
view(1) and then the Locations area (2).
Select the Table (3) on which the LDU is
set up.
Select the icon of the LDU(1).
Click on the Settings... button (2).
Select the Dipping area tab (1).
Click on the Reference run button (2).
The LDU performs a reference run.
4 Operation
4.12 Fitting
72 User Manual SIPLACE Linear Dipping Unit 2 X 05/2020
4.12 Fitting
NOTICE
Target group: standard operator
The procedure described is a regular task that can be carried out by any trained operator.
Before filling in the flux, you have to fit all the parts of the LDU. You will be guided through this pro-
cess by the station software.
NOTICE
Observe the exact order
It is important to perform the steps for fitting the parts in the order described here.
In the station software, select the Setup
view(1) and then the Locations area (2).
Select the Table (3) on which the LDU is
set up.
Select the icon of the LDU(1).
Click on the Settings... button (2).
Select the Cleaning tab.