SIPLACE D系列Servicemanual - 第51页
Service Work D3 Gantry Servicemanual (internal version) SIPLACE D Series 51 Shortening X hoses at the X trailing cable clamp (to the pneumatic distributor at the head mount) 1. Gauge for shortening the hoses 2. X trailin…

Service Work
Gantry D3
50 Servicemanual (internal version) SIPLACE D Series
Preparing the Trailing Cable
Handling and overview of gauge
The trailing cable is supplied as a complete
assembly.
The pneumatic hoses need to be shortened to the
exact length of the distance to the pneumatic
distributor on the head mount and in the machine.
Use the gauge to help you with this. The existing
pneumatic hoses, which are run in the machine,
need to be cut through and connected to the
trailing cable at the exact position, with the help of
hose couplings [03049770-01].
There are two gauges available, for the different
gantries.
Gauge for Trailing cable, gantry 1+3 X series
[0038302901]
Gauge for Trailing cable, gantry 2+4 X series
[0038305701]
Only for the rotated gantry 2+4 for SIPLACE
X4i:
Gauge for Trailing cable SIPLACE X4i 2P G
[03051596-01]
Legend
The gauges are labeled to ensure correct
handling.
1. Stopper edge for clamping X + Y: this side of
the gauge must be attached to the respective
trailing cable clamp.
2. Machine inside: This side of the gauge must
point to the inside of the machine.
3. Gauge designations
4. X hose: this is where you see the 7 drillings for
the X hose markings.
5. Y hose: this is where you see the 7 drillings for
the Y hose markings.

Service Work
D3 Gantry
Servicemanual (internal version) SIPLACE D Series
51
Shortening X hoses at the X trailing cable
clamp (to the pneumatic distributor at the
head mount)
1. Gauge for shortening the hoses
2. X trailing cable clamp
3. Stopper edge (gauge at clamp)
4. Hose marking
X Observe the designation for the respective
gantry on the gauge (1) (gantry 1+3 or gantry
2+4). Select the correct gauge.
X Place the stopper edge (3) of the gauge (see
mark labeled edge for clamp X+ Y on the
gauge) at the edge of the clamping plate (2) for
the X trailing cable.
X Mark the pneumatic hoses through the holes
(4) in the gauge. Observe the position labeled
X hose.
ATTENTION:
Mark the correct position!
X Observe the position labeled X hose.
X Observe the position marked
machine inside on the gauge.
X To ensure that they have the correct
length, cut the pneumatic hoses at
the marking labeled "X hose". If the
pneumatic hoses are cut too short,
you will have to discard the entire
trailing cable.
X Use the hose pliers to cut the pneumatic hoses
at the marked position. The pneumatic hoses
can now be run inside the pneumatic
distributor, with the correct curvature.

Service Work
Gantry D3
52 Servicemanual (internal version) SIPLACE D Series
Shortening the Y hoses to the pneumatic
distributor in the machine base
1. Gauge for shortening the hoses
2. Stopper edge at the machine base clamp
3. Hose marking
X Observe the designation for the respective
gantry on the gauge (1) (gantry 1+3 or gantry
2+4). Select the correct gauge.
X Place the stopper edge (2) of the gauge (see
mark labeled edge for clamp X +Y on the
gauge) at the edge of the clamp for the Y axis.
X Mark the pneumatic hoses through the holes
(3) in the gauge.
ATTENTION:
Mark the correct position!
X Observe the position labeled Y
hose.
X To ensure that they have the correct
length, cut the pneumatic hoses at
the marking labeled "Y hose". If the
pneumatic hoses are cut too short,
you will have to discard the entire
trailing cable.
X Use the hose pliers to cut the pneumatic hoses
at the marked position. The pneumatic hoses
should now have the correct length and can be
connected to the severed pneumatic hoses in
the machine base.