03217917-01-01E By DEK Technical Reference Manual Vol 1_enPDFA - 第10页
10 TECHNICAL REFERENCE MANUAL Vol 1 E By DEK 04/2019 TABLE OF CONTENTS 16.5.3 Board Clamps To Snuggers 255 16.5.4 Snuggers To Board Clamps 257 16.5.5 Heavy Board Rails Drive Belt 259 16.6 CALIBRATIONS 260 16.6.1 Belt Spe…

9TECHNICAL REFERENCE MANUAL Vol 1 E By DEK 04/2019
TABLE OF CONTENTS
15 BOARD STOP 191
15.1 INTRODUCTION 191
15.2 CAMERA MOUNTED BOARD STOP 192
15.3 REMOTE MOUNTED BOARD STOP 194
15.4 ELECTRICAL SCHEMATIC 195
15.5 PNEUMATIC SCHEMATIC 196
15.5.1 Machine Rear Solenoids 196
15.6 ADJUSTMENTS AND SETTINGS 197
15.6.1 Camera Board At Stop Sensor 197
15.6.2 Configuring The Remote Board Stop 199
15.6.2.1 LHS Configuration 199
15.6.2.2 RHS Configuration 201
15.6.3 Setting The Remote Board Stop 203
15.6.3.1 Board At Stop Sensor 204
15.6.4 Camera To Remote Board Stop - LHS Configuration 206
15.6.4.1 Preparation 206
15.6.4.2 External Services 207
15.6.4.3 Fitting The Remote Board Stop 208
15.6.5 Camera To Remote Board Stop - RHS Configuration 210
15.6.5.1 Preparation 210
15.6.5.2 External Services 211
15.6.5.3 Fitting The Remote Board Stop 212
15.6.6 Remote Board Stop - LHS To RHS Configuration 214
15.6.6.1 Preparation 214
15.6.6.2 External Services 215
15.6.6.3 Fitting The Remote Board Stop 215
15.6.7 Remote Board Stop - RHS To LHS Configuration 219
15.6.7.1 Preparation 219
15.6.7.2 External Services 220
15.6.7.3 Fitting The Remote Board Stop 220
15.6.8 Remote Board Stop - Same Side Configuration 223
15.6.8.1 Preparation 223
15.7 CALIBRATION 225
15.7.1 Board Stop X Offset 225
16
TRANSPORT RAILS MODULE 227
16.1 OVERVIEW 227
16.1.1 Board Clamping Arrangements 229
16.2 ELECTRICAL SCHEMATIC 231
16.3 PNEUMATIC SCHEMATIC 232
16.4 ADJUSTMENTS AND SETTINGS 233
16.4.1 Rail Lifted Sensors 233
16.4.2 Board At Left/Right Optos 235
16.4.2.1 Ultrasonic Sensors 237
16.4.3 Board Clamp Setting 238
16.4.4 Foil-Less Clamp Height Adjustment 242
16.4.5 Front Rail Parallelism 243
16.4.6 Rear Rail Parallelism 247
16.4.7 Board To Snugger Gap 249
16.4.8 Home Position Rail Width Check 250
16.4.9 Rail To Table Height 252
16.5 REPLACEMENT PROCEDURES 253
16.5.1 Board Clamp Replacement 253
16.5.2 Board Clamp Foil Replacement 254

10 TECHNICAL REFERENCE MANUAL Vol 1 E By DEK 04/2019
TABLE OF CONTENTS
16.5.3 Board Clamps To Snuggers 255
16.5.4 Snuggers To Board Clamps 257
16.5.5 Heavy Board Rails Drive Belt 259
16.6 CALIBRATIONS 260
16.6.1 Belt Speed Calibration Procedure 260
17
CAMERA SYSTEM MODULE 263
17.1 OVERVIEW 263
17.2 ELECTRICAL SCHEMATIC 265
17.3 ADJUSTMENTS AND SETTINGS 266
17.3.1 X Camera Home Positioning 266
17.3.2 Y Camera Home Positioning 266
17.3.3 X Axis Parallelism 266
17.3.4 Y Axis Parallelism 270
17.3.5 Vision Height For Standard Rail System 271
17.3.6 Camera Focus 272
17.3.7 Camera Reference Position 272
17.4 REPLACEMENT PROCEDURES 274
17.4.1 Camera 274
17.4.1.1 Removal 274
17.4.1.2 Fitment 275
17.4.2 Camera X Axis Timing Belt 276
17.4.3 Camera Y Axis Timing Belt 278
17.5 CALIBRATIONS AND CHECKS 282
17.5.1 Board Stop X Offset Check 282
17.5.2 Vision System Calibration 284
17.5.2.1 Calibration Procedure 284
17.5.2.2 Stage 1 - Calibrate Vision 284
17.5.2.3 Stage 2 - Calibrate Offset 287
17.5.2.4 Associated Calibrations 288
17.6 APPENDIX A - VISION SYSTEM SETUP 289
17.6.1 Preparing The Vision System 289
17.6.2 Video Model 290

1 MANUAL INFORMATION
1.1 MANUAL CHANGE REQUEST
TECHNICAL REFERENCE MANUAL Vol 1 E By DEK 04/2019 11
1
MANUAL INFORMATION
1.1 MANUAL CHANGE REQUEST
Information in this manual is subject to change without notice.
No part of this manual may be reproduced, transmitted in any form or means, electronically or
mechanically, including photocopying and recording, for any purpose without the express written
permission of ASM Assembly Systems Singapore Pte Ltd.
Every effort has been made during the composition of this manual to ensure that the information
has been clearly presented and correct in all respects.
If during the use of this manual, errors or omissions are found, or the reader considers that im-
provements are necessary to overcome any ambiguity or inaccuracies, a copy of the manual
change request form (see overleaf) should be completed and either faxed or forwarded to the ad-
dress below, accompanied with a copy of the relevant page and/or figure of the manual with the re-
commendation.
Quality Manager
ASM Assembly Systems Weymouth Ltd
11 Albany Road
Granby Industrial Estate
Weymouth
Dorset
DT4 9TH
England
Tel: +44 1305 760760
Fax: +44 1305 760123
www.asm-smt.com