CP-7[732-742]-series Mechanical Reference(2.9E) - 第141页

3.10 Replacing the V acuum Hoses Procedure W ARNING • Be sure to switch off the 200V power supply before beginning this procedure. • The spring force may cause the cam axis to rotate if the cam axis is positioned anywher…

100%1 / 251
Conectors
Conectors
C7SM3062E
C7SM3064E
L
1.8 mm
Motor pulley
Vacuum pump pulley
Load
Amount of slack
Load
Tension meter *
* : Polyflex tension meter manufactured by Gates Co.
New Belt
1.8 mm
0.50 ~ 0.60 kg
28 ~ 34 lb
Belt During Use
1.8 mm
0.38 ~ 0.46 kg
20 ~ 26 lb
9ST 9ST
CP-742ME
CP-742E
CP-732E
180
Cam angle 180°
Push the hose (from the head
manifold) all the way to the
back of the support axis nipple
at theposition shown in the
figure at right.
Nozzle shaft
assembly
Nozzle shaft
assembly
Vacuum hoses
Vacuum hoses
Head manifold
Head manifold
1
0
1
0
2
3
4
3
2
Vacuum hoses
Nozzle holder
C7SM3083E
C7SM3086E
Type 1 Type 2 Type 3
CP-732E
CP-742E
CP-742ME
~CX29
-
-
CX29~CX49
Type 1 Type 2 Type 3
-
-
CX49~
CX4~
CX7~
C7SM3085E
CP-732E
CP-742E
CP-742ME
~CX155
-
~CX99
CX156~
Type A Type B
Type A Type B
CX4~
CX100~
A2835DCGC6023
DCGC0140
DCGC0261
C7SM3090E
UV lamp
Power supply unit