Checking the Three-phase Connections Perform the following procedure to verify that the three-phases are properly connected. 1. Turn the 200V power on. 2 Log in the machine. 3. Press the [AUTO] button (but do not press S…

Wiring the Transformer
1. Open the transformer box cover.
2. Wire the transformer’s primary taps to match the supplied voltage.
<CP-742E>
Transformer box
Transformer box
Transformer box
C7SM5004a
<CP-732E> <CP-742ME>
Part 6 Chapter 3 Electrical Power Supply & Transformer Wiring
Edition 2.6 6-3-2 CP-7 series Mechanical Reference

Checking the Three-phase Connections
Perform the following procedure to verify that the three-phases are properly connected.
1. Turn the 200V power on.
2 Log in the machine.
3. Press the [AUTO] button (but do not press START).
Note: Do not press the START button.
The vacuum pump begins operating when [AUTO] is pressed, so disconnect the
hose to verify that suction exists. If there is suction, this indicates that the wiring is
correct and the motor is rotating in the correct direction. If the air flow is reversed
(air is blowing out instead of in), then turn the main power off and reverse the three-
phase power cable’s U-phase and V-phase connections, then try again.
Caution: To avoid leaks, the hose should be pushed firmly into position, and then secured in
position with the hose band.
C7SM5005a
air
Hose
Hose band
<CP-742E><CP-732E> <CP-742ME>
Part 6 Chapter 3 Electrical Power Supply & Transformer Wiring
Edition 2.6 6-3-3 CP-7 series Mechanical Reference

Notes: