TRS Advanced WB Intel Issue 02 - 第129页
Issue 2, Nov 14 TRS Advanced Maintenance 129 Surround plate setup Note setup, soft lift land and pitch adjustm ent checks must have been completed before this stage. • If not already done loosen all fasteners that hol d …

TRS Advanced Maintenance
128
Issue 2, Nov 14
Pitch Adjustment: Follow the procedure from Pre-Production setup “Pitch and Level
Adjustment”
OutstandingIssue ProbableCause(s) SuggestedAction
TRAjointsloos ening.
Wor kthroughprocedures3&4.Ifthe
problemis notresolvedorworsens,
contactDEKcustomersupport.
Railcapnotcorrectlysupported.
Railcappadsnotplanar.
Gapbecomesirregularor
asymmetricalwithload
applied.
Fro ntorreargapbecom es
muchlarg eraftertooling
changeover.
Pressuredistribution
isnot
appropriateforcurrenttoolloading .
Performdetailedindependentsurface
ins pections ofbothpartsandsumlocal
deviations.Comparetoprocesslimits.
ContactDEKcustomersupporttodiscuss
specifictooling requirements.
Gapincreasesafterextended
machineoperation.
SeeTRSmodulesetupdocum entationfor
ins tructions onhowtocheckandreset
therail
ca ptobaseheight.
TRPstand‐offscrewsset
correctlyonsurfacetablebut
willnotlevelonfourpoints
torailcap.
SupportsarenotplanarandtheTRPis
beingdistortedbythetwisting
momentapplied.
Wor kthroughprocedures3&4.
Gapistooincons is tenteven
whennoloadisappliedto
anyparts.
TRPandSurroundplatesurfacesare
irregularrelativetoeac hother.
(Objective 43, Page 123)

Issue 2, Nov 14
TRS Advanced Maintenance
129
Surround plate setup
Note
setup, soft lift land and pitch adjustment checks must have been completed
before this stage.
• If not already done loosen all fasteners that hold the top and bottom surround plate to the
bearings. (Screw Thread engagement still needed but both plates must be free to move)
• With the TRP in home position and table at transport height
• Load a tray with substrates
• Drive TRP over rails
• Apply TRP pressure
• Toggle vacuum on
• Drive table to Vision height
• Check that the four TRP height adjustment screws are not in contact with the rail cap and
that the TRP is flat against the surround.
• Toggle on the Z lock
• Toggle on the active surround
• Drive TRP to home position
• All substrates should be sat within the surround and surround referencing the substrates into
the top left corner of the top surround plate.
• Using your finger check for movement in all substrates in X and Y direction.
• If any movement is found manual adjustment is needed to the position of the top surround plate.
• After observing the movement in the substrates determine the movement needed in the
to apply equal pressure to the side walls of each substrate in each position.
• With one hand manually apply pressure to the top surround plate moving it in the direction desir
e
• With you other hand check for movement across all substrates and continue to apply
pressure until movement has been removed.
• Visually check that no gaps can be observed between the substrates sidewalls and surround
plates top and bottom
• Whilst still applying force to the top surround plate; In a circular motion tighten all surround
plate screws, this doesn’t need to be over tightened and should be equal to 1.8Nm

TRS
A
130
V
er
A
im
To
v
To
o
·
·
Not
e
Ma
k
·
ste
p
·
·
·
·
·
·
are
a
·
cap
·
·
con
t
c
A
dvanced
M
ification
o
:
v
erify that
a
o
ls requir
e
Depth mi
c
Co-planar
e
k
e sure all
Remove
a
p
)
At transp
o
Apply TR
P
Drive to vi
Toggle Z l
Drive TR
P
Position t
h
a
Using the
.
Complete
If the tow
e
t
rol
c
entre and
M
aintenanc
e
o
f Tower
C
a
ll tower a
e
d
c
rometre
ity bars
tools are
c
a
ny popula
o
rt height
d
P
pressur
e
sion heig
h
ock on
P
to home
p
h
e co-plan
a
depth Mic
the table
b
e
r co-plan
a
log a rep
o
e
C
o-Planari
ssemblies
c
alibrated
ted trays f
r
d
rive TRP
o
e
h
t
p
osition
a
rity bars i
rometre ta
b
elow with
a
rity is fou
n
o
rt for inve
s
ty
are within
r
om the s
y
o
ver rails
p
n the Cha
s
ke readin
g
measure
m
n
d to be o
u
s
tigation
60µm Co
-
y
stem (Su
b
p
osition
s
e over th
e
g
s from fo
u
m
ents
u
t of speci
f
-
planarity
w
b
strates n
o
e
tooling
u
r position
s
f
ication ple
Issu
w
hen inst
a
o
t required
s
around t
h
ase conta
c
u
e 2, Nov 14
a
lled in the
for this
h
e tower
c
t the loca
machine
l service