Vakuum Tooling AMKOR X4 OS Applikation - 第45页

Installation instructions Vacuum Tooling AM KOR (00188501-01) SIPLACE X4 / OS Application 03/2006 Edition 45 2 Fig. 2.1 1 - 2 Wiring of maintenance un it 2 2 2 2 X1qa +24V (Clamp 21-27) X1qa PE (Clamp 1-3) X1qa GND (Clam…

100%1 / 56
Installation instructions Vacuum Tooling AMKOR (00188501-01) SIPLACE X4 / OS Application
03/2006 Edition
44
Electrical wiring of the maintenance unit 2
2
Fig. 2.11 - 1 Wiring of maintenance unit
2
2
Installation instructions Vacuum Tooling AMKOR (00188501-01) SIPLACE X4 / OS Application
03/2006 Edition
45
2
Fig. 2.11 - 2 Wiring of maintenance unit
2
2
2
2
X1qa +24V (Clamp 21-27)
X1qa PE (Clamp 1-3)
X1qa GND (Clamp 4-13)
Installation instructions Vacuum Tooling AMKOR (00188501-01) SIPLACE X4 / OS Application
03/2006 Edition
46
2.8.2 Hoses inside the machine
2
Compressed air hose on the
maintenance unit 2
Running compressed air hose
in the cable duct (placement area 1)2
Removing panel over the
cable duct (PA 1) 2
Running cables and hoses
in placement area 2 2