00192156-04 - 第81页

Maintenance Inst ructions F Maintenance 03/2003 US Edition 10 Annual maintenance work 81 10 Y ou will need the followi ng tools, eq uipmen t and consum ables for the annua l mainten ance. 10 – V acuum c leaner – Set of h…

100%1 / 100
Maintenance Maintenance Instructions F
10 Annual maintenance work 03/2003 US Edition
80
10 Annual maintenance work
10
Maintenance Instructions F Maintenance
03/2003 US Edition 10 Annual maintenance work
81
10
You will need the following tools, equipment and consumables for the annual maintenance. 10
Vacuum cleaner
Set of hexagon socket spanners
SIPLACE cleaning tissue (article no. 00315253-02)
Grease cartridge with Urethyn E/M2 (article no.: 02101696-01)
10
: Select “Block manually” (status closed) on the station computer and click on OK (for dual con-
veyor track 1 / track 2).
The placement machine will continue to produce until the last PCB is complete and has left the
PCB conveyor.
: Switch the placement system off at the main switch.
: Open the protective hood.
10
10
: Move the gantry over the feeders. This will stop it outside your working area.
10
To move the gantry, take hold of the handle and push gently and carefully. 10
10
10
Vacuum beneath the lifting table 10
: Lift the lifting table out of the placement machine.
: Carefully vacuum the area beneath the lifting table.
10
10
Clean and preserve the PCB conveyor 10
a Preserve the recirculating ball screw by running a SIPLACE cleaning tissue along the thread
of the screw.
s Preserve the sliding surfaces of the guide rails using a SIPLACE cleaning tissue.
d Preserve the hexagonal shafts using a SIPLACE cleaning tissue.
f Preserve the guide shafts of the PCB stopper using a SIPLACE cleaning tissue.
10
Maintenance Maintenance Instructions F
10 Annual maintenance work 03/2003 US Edition
82
10