semi automatic INTRODUCTION GENE RAL Chapter Issue 1 Oct 02 Instal lation Manual 1.1 CHAPTER 1 INTRODUCTION GENERAL T o prevent damage to the machi ne whilst unpack ing or during machine power up it is e ssential to read…

100%1 / 86
semi automatic
MANUAL CHANGE REQUEST FORM
Installation Manual
CUSTOMER USE
ORIGINATOR
Name & Department
Position
Telephone No.
Email
Fax No.
Model Number
Software Version
Machine Serial No.
Title
Chapter / Issue State
Page No. / Figure No.
Company
MACHINE TYPE
DETAILS OF CHANGE
ACCEPTED
DETAILS OF CHANGE
MANUALS AFFECTED
ACTION COMPLETE
Date:Author: Customer informed
of action taken:
MANUAL
DEK USE
DATE:
Log No.
YES NO Reason:Priority:
immediate
next release
Tech Refs User Install. S/AloneEng Spec GA/Ccts Other
semi automatic
INTRODUCTION
GENERAL
Chapter Issue 1 Oct 02 Installation Manual 1.1
CHAPTER 1 INTRODUCTION
GENERAL
To prevent damage to the machine whilst unpacking or during machine power
up it is essential to read and adhere to the procedures and sequences detailed
in the Installation Manual and to ensure the correct method of unpacking and
assembly of the machine, machine preparation and power up sequences are
carried out prior to the normal running operations of the machine.
Authorized
Personnel
Only DEK authorized personnel may carry out the procedure detailed in this
document.
Chapter 2 Safety Features, describes the features on the machine that provide operator
safety whilst the machine is in operation.
Chapter 3 Services Required, describes the services needed for the machine to function
correctly. A view of the service panel showing the external connections to the
services and positioning of the circuit breakers is also shown.
Chapter 4 Unpacking Instructions, describes the method of dismantling and unpacking the
transit boxes, checking the machine, loose items and documentation. Checking
the machine configuration against customer requirements, assembling the
loose items to the machine and transportation of the machine to its designated
area.
Chapter 5 Machine Preparation, describes the method of transporting the machine into
position, removal of transit brackets, fitting the external services, adjusting the
height and levelling the machine in preparation for machine power up.
Chapter 6 Power Up Sequence, describes the sequence of machine power up and
checking of home sensor positions, system calibrations and settings, and new
product setup using a test board.
Chapter 7 Machine Performance, details the method of checking the machine perform-
ance with the customers board for alignment.
Chapter 8 Installation Documentation, describes the installation and acceptance docu-
mentation that accompanies the machine.
semi automatic
INTRODUCTION
GENERAL
1.2 Installation Manual Chapter Issue 1 Oct 02
Installation
Procedure
The procedures in this manual must be adhered to in the order that they are
presented.
On installation, the machine must meet the required specification of perform-
ance. All installation and machine performance data must be returned to DEK.
Anti-Static
Handling
Standard precautions must be adhered to when handling, configuring and
installing all electronic cards.
Anti-static precautions are necessary when connecting and disconnecting the
signal cables from the machine PC to the machine controller enclosures.
Delivery
Questionnaire
After the installation has been completed, the installing engineer should make
the customer aware of the Delivery Questionnaire.
Machine
Relocation
In the event of machine relocation, refer to the Technical Reference Manual,
Transportation chapter for transit bracket fitment procedure.