YC8_Ope_E - 第29页
Appendi x A1. Specifications A- 1 Inde x

3. Starting and stopping the machine 2-17
3.1 Pre-operation check 2-18
3.2 Starting the machine 2-19
3.3 Warming up the machine 2-21
3
3.4.1 Conveyor unit setup flow 2-24
4. Preparing the component supply unit 2-26
4.1 Setting the tape 2-26
4.2 Setting a tape feed pitch 2-31
4.2.1 Setting a pitch from the mounter 2-31
4.2.2 Setting a pitch from an external setup power station 2-33
4.3 Setting the tray components 2-35
4.3.1 Setting the component trays in the pallet 2-35
4.3.2 Setting a pallet in the ATS15 2-36
5. Settings on the mounter side 2-37
5.1 Setting the "Package" parameter. 2-37
1
Chapter 3 Starting and ending production
1. Starting production 3-1
1.1 Resuming operation from the stopped point 3-6
1.1.1 Loading the saved data 3-7
1.1.2 Editing mount flags 3-7
2. Ending production and turning power off 3-8
0
3.1 Production 3-10
2
4
6
3.5 Alignment 3-18
3.6 Retry 3-19
0
1
2
3.10 Pick Rate Warning 3-24

About this manual
The instruction manual of this machine is written for those who operate
this machine.
Please read this manual carefully for correct operations and pay
special attention to safety precautions.
After reading through this manual, please use this manual as an
occasional reference and keep it within reach.
About this manual
Contents
1. Using this manual i
1.1 Available manuals i
1.2 Manual contents ii
2. Contents of each chapter iii
3. Page layout iv
