INFINITY ,1752'8&7,21 *(1(5$/ 1.2 Instal lation Ma nual Chapter Issue 1 Nov 99 Inst allation Procedure The procedures i n this manual must be adhered to in the or der that the y are presented. On inst allation, …

100%1 / 2
INFINITY
,1752'8&7,21
*(1(5$/
Chapter Issue 1 Nov 99 Installation Manual 1.1
CHAPTER 1 INTRODUCTION
GENERAL To prevent damage to the machine whilst unpacking or during machine power
up it is essential to read and adhere to the procedures and sequences detailed
in the Installation Manual and to ensure the correct method of unpacking and
assembly of the machine, machine preparation and power up sequences are
carried out prior to the normal running operations of the machine.
Authorized
Personnel
Only DEK authorized personnel may carry out the procedure detailed in this
document.
Manual Format
Section 2 Safety Features, describes the features on the machine that provide operator
safety whilst the machine is in operation.
Section 3 Services Required, describes the services needed for the machine to function
correctly. A view of the service panel showing the external connections to the
services and positioning of the circuit breakers is also shown.
Section 4 Unpacking Instructions, describes the method of dismantling and unpacking the
transit boxes, checking the machine, loose items and documentation. Checking
the machine configuration against customer requirements, assembling the
loose items to the machine and transportation of the machine to its designated
area.
Section 5 Machine Preparation, describes the method of transporting the machine into
position, removal of transit brackets, fitting the external services, adjusting the
height and levelling the machine in preparation for machine power up.
Section 6 Power Up Sequence, describes the sequence of machine power up and
checking of home sensor positions, system calibrations, settings and new
product setup using a test board.
Section 7 External Machine Interface, describes the procedure for interfacing the screen
printer to external machines (such as a placement machine), DEK ancillary
equipment and checking the functionality of the machine.
Section 8 Machine Performance, details the method of checking the machine perform-
ance with the customer’s board for alignment.
Section 9 Installation Documentation, describes the installation and acceptance docu-
mentation that accompanies the machine.
INFINITY
,1752'8&7,21
*(1(5$/
1.2 Installation Manual Chapter Issue 1 Nov 99
Installation
Procedure
The procedures in this manual must be adhered to in the order that they are
presented.
On installation, the machine must meet the required specification of perform-
ance. All installation and machine performance data must be returned to DEK.
Anti-Static
Handling
Standard precautions must be adhered to when handling all electronic cards
and configuring and inserting them into the enclosures.
Anti-static precautions are necessary when connecting and disconnecting the
signal cables from the machine PC to the machine controller enclosures.
Delivery
Questionnaire
After the installation has been completed, the installing engineer should make
the customer aware of the Delivery Questionnaire.
Machine
Relocation
In the event of machine relocation, refer to the Technical Reference Manual,
Transportation Chapter for the complete relocation procedure.