YAMAHA-YG系列 换螺杆指导书.pdf - 第2页

Service Engineer Service I nformati on SI080 2008 E-000 = YG series: Replacement proc edure for ball screws of each axis 2/65 4.3. How to mount the new bearing...... ......................................................…

100%1 / 65
Service Engineer
Service Information
SI0802008E-000= YG series: Replacement procedure for ball screws of each axis
1/65
MACHINE TYPE :
YGD,YG88,YG100,YG200,YG200L,YG88R,
YG100R, YG300
CLASSIFICATION : Maintenance
REFERENCE : H010958, H010441,
YG300 Calib Sm Adjustment Manual
YG series: Replacement procedure for ball screws of each axis
Warning:
This document is for people who have completed the maintenance training. The misuse of this
document may cause a serious problem. Please make sure to use this under the instruction of the
person who has completed the training or a YAMAHA serviceman.
YAMAHA is not responsible for any problems caused by the misuse of this document. Please use it on
your own responsibility.
1. How to replace a ball screw of X-axis .................................................................................................. 3
1.1. Work to be done before replacement ........................................................................................... 3
1.2. How to remove the ball screw of X-axis ........................................................................................4
1.3. How to assemble the ball screw Assy. and other attached components ...................................... 8
1.4. Centering of the axis ...................................................................................................................12
1.4.1. Perform centering of the X-axis ball screw........................................................................... 12
1.4.2. Adjustment after replacing the ball screw............................................................................. 13
1.5. Necessary adjustment................................................................................................................. 13
2. How to replace a ball screw of Y1,2-axis ...........................................................................................14
2.1. Work to be done before replacement ......................................................................................... 14
2.2. How to remove the ball screw of Y1,2-axis .................................................................................15
2.2.1. Sub-assembly....................................................................................................................... 19
2.3. How to assemble the ball screw Assy. and other attached components .................................... 20
2.4. Centering of the Y-axis................................................................................................................ 23
2.4.1. How to perform centering of the Y-axis ball screw [Common to both Y1 and Y2-axis]........ 23
2.4.2. Adjustment after replacing the ball screw............................................................................. 24
2.5. Necessary adjustment................................................................................................................. 24
3. How to replace a ball screw of the PU-axis (Single, Double)............................................................. 25
3.1. How to remove the ball screw of the PU-axis ............................................................................. 27
3.2. How to mount the new ball screw................................................................................................ 31
3.2.1. How to adjust the flatness of the pushup plate..................................................................... 35
3.3. Adjustment after replacing the axis.............................................................................................38
4. How to replace a ball screw of the W-axis......................................................................................... 39
4.1. Work to be done before replacement ......................................................................................... 39
4.2. How to remove the ball screw ..................................................................................................... 40
No: SI0802008E-000
ISSUED DATE: August 1, 2008
Service Engineer
Service Information
SI0802008E-000= YG series: Replacement procedure for ball screws of each axis
2/65
4.3. How to mount the new bearing.................................................................................................... 43
4.4. Adjustment after replacing the ball screw ................................................................................... 45
5. Adjustment ......................................................................................................................................... 46
5.1. Start up the “Asjutment utility ..................................................................................................... 46
5.2. Initial Setting (How to switch the mode while the “Adjustment Utility” is running) ....................... 47
5.3. Useful functions (Help)................................................................................................................ 49
5.4. Machine reference for each axis.................................................................................................50
5.4.1. Check the machine reference for each axis......................................................................... 50
5.4.2. Adjust the machine reference............................................................................................... 51
5.4.3. Check and adjust the Y2-axis dual offset.............................................................................52
5.5. How to set the reference coordinate ...........................................................................................53
5.5.1. Set the reference coordinate before replacement of the Axis .............................................. 53
5.5.2. Adjust the axis position to the reference coordinate after replacing the ball screw.............. 54
5.6. Adjustment of the soft limit.......................................................................................................... 55
5.6.1. Adjustment of the soft limit ...................................................................................................56
5.6.2. Check the soft limit ............................................................................................................... 57
5.7. Adjustment of the soft limit for YG300 model <Calib Sm Ver.3.02R1.000 or later> ................... 58
5.8. Check the peak current (with the “Servo” utility) ......................................................................... 60
5.9. The belt tension specifications .................................................................................................... 63
Service Engineer
Service Information
SI0802008E-000= YG series: Replacement procedure for ball screws of each axis
3/65
1. How to replace a ball screw of X-axis
<Overview>
Though the component parts that make up the ball screw Assy. vary depends on the models, there are
three main types of them.
This document describes the replacement method of the ball screws by dividing them into three types
depends on the models as follows:
- YGD
- YG88, YG100, YG200 (L), YG300
- YG88R, YG100R
Required tools
- Phillips-head screw driver (Standard type)
- Hex wrench set
- Special T-shape hex wrench (Size 5) or ratchet wrench set
- Nipper
- Some cable ties (150mm, 250mm)
- Marker pen (Used after checking if the screws are tightened properly)
- New ball screw for X-axis (Sub-Assy. Part)
1.1. Work to be done before replacement
The coordinates of the machine deviate due to the replacement of the parts. Therefore, some works
need to be done in order to restore the coordinates in the simple method.
Also, in case the ball screw is broken or the problem such as seizure occurs, the works before the
replacement cannot be performed and various adjustments need to be performed.
Caution:
Please make sure to do the necessary work before replacement. Otherwise, you will need to perform
all the adjustment, which requires a great deal of time later on.
<Works to be done>
- Check the machine reference of each axis
- Set the reference coordinate before replacing the ball screw.
* Please refer to the relevant section in “5. Adjustment”.