00196626-06_AI_Portalmodularitaet_SX12_de_en.pdf - 第119页
Backpage

Dismantling a Gantry
Checklist Firmware Download
118 Gantry Modularity Portalmodularität
4.3 Checklist
► Put this check list in the machine logbook.
Gantry dismantled (downgrade)
Step Action Who?
1 Gantry removed? Customer in line with assembly
guide
2 Is the gantry secured in the gantry carrier? Customer in line with assembly
guide
3 Head secured in center of gantry? Customer in line with assembly
guide
4 Are the correct end position buffers fitted? Customer in line with assembly
guide
5 Has the trailing cable been packed correctly and fixed
in the machine?
Customer in line with assembly
guide
6 Has the stationary camera (optional) been dismantled,
if necessary?
Customer in line with assembly
guide
7 Have the camera connections been unplugged from the
box PC?
Customer in line with assembly
guide
8 Has the nozzle changer been dismantled, if necessary Customer in line with assembly
guide
9 Is the reject bin fitted? Customer in line with assembly
guide
10 Have all tools been removed from the machine? Customer in line with assembly
guide
11 Are the doors screwed? Customer in line with assembly
guide
12 Is the machine switched on and ready for operation? Customer in line with assembly
guide
13 Have all calibration steps been performed? Customer in line with assembly
guide
Date Signature
Backpage

Item no.: 00196626-06 ASM Assembly Systems GmbH & Co. KG
Rupert-Mayer-Strasse 44
81379 München
Germany
www.siplace.com