Infinity Installation Documentation.pdf - 第3页
INFINITY ,167$//$ 7,21'2&80 (17$7,21 ,167$//$7 ,21&+(&. /,67 Chapter Issue 4 June 01 Instal lation Ma nual 9.3 No. MACHINE PERFORMANCE REFERENCE Completed 20 C arry out Mac hine Cap ability: Chapt er 8…

INFINITY
,167$//$7,21'2&80(17$7,21
,167$//$7,21&+(&./,67
9.2 Installation Manual Chapter Issue 4 June 01
INSTALLATION CHECKLIST
No. GENERAL REFERENCE Completed
1 Check Machine for Transit Damage Chapter 4
2 Check Accessories are Correct to Work Order
No. MACHINE PREPARATION REFERENCE Completed
3 Transport to Final Destination Chapter 5
4 Remove Transit Brackets
5 Fit Machine Components
6 Carry out Pre Installation Checks
7 Set Machine Height and Level
No. MACHINE PREPARATION REFERENCE Completed
8 Check Shock Watches: Chapter 5
Triggered: Un-Triggered:
Machine PC
Machine Controller
Printhead
Camera
No. SERVICES REFERENCE Completed
9 Measure Customer Factory Electrical Supply Chapter 6
10 Ensure transformer tapped correctly
11 Check Documentation and Machine Ser No. Plate
Matches Supply
No. POWER UP SEQUENCE REFERENCE Completed
12 Run Chkdsk (If any bad sectors are found, the log
file must be returned to the DEK UK Customer
Support Helpdesk)
Chapter 6
13 Check Correct Operation of E Stop Loop compo-
nents
14 Carry out Screen Clean Function Check (if fitted)
15 Carry out Paste Dispenser Function Check (if fitted)
16 Carry out New Product Set Up
No. FMI REFERENCE Completed
17 Check the MIU is Correctly Configured Chapter 7
18 Check that MIU is Selected in Set Prefs
19 Check Operation of Interface

INFINITY
,167$//$7,21'2&80(17$7,21
,167$//$7,21&+(&./,67
Chapter Issue 4 June 01 Installation Manual 9.3
No. MACHINE PERFORMANCE REFERENCE Completed
20 Carry out Machine Capability: Chapter 8
Cp Cpk No
Change
X Alignment (Front)
X Alignment (Rear)
Y Alignment (Front)
Y Alignment (Rear)
θ Alignment (Front)
θ Alignment (Rear)
Front Pressure
Rear Pressure
Front Print Speed
Rear Print Speed
Cycle Time ..........................Secs
21 Carry out Virus Check
No. ON SITE TRAINING REFERENCE Completed
2 2 S a f e t y S e t t i n g U p N e w P r o d u c t s M a c h i n e T r a i n i n g
P o w e r p o i n t
and Workbook
Machine Overview Running Production
Loading a Board File Cleaning the Screen
Loading a Screen Cleaning the Printer
Setting Up Tooling Inspecting the Printer
Changing Squeegees Using the Machine Log
Book
Loading Paste Recovering from Common
Error Messages
No. DOCUMENTATION REFERENCE Completed
23 Service Report
Chapter 9
24 Acceptance Report
25 Installation Report
MACHINE MODEL
MACHINE SERIAL NUMBER
RETURN COPY TO DEK CUSTOMER SUPPORT SUPERVISOR

INFINITY
,167$//$7,21'2&80(17$7,21
,167$//$7,21&+(&./,67
9.4 Installation Manual Chapter Issue 4 June 01
INTENTIONALLY LEFT BLANK