00197962-01_2nd_HMI_and_Tower_Light_en.pdf - 第40页
Installing the 2 Tower Light Kit or the 3 Tower Light Kit Installing the 2 Tower Light or 3 Towe r Light Kits 40 Assembly Instructions SIPLACE E Step 3: ► Secure the 2 tower light with the provided M 4x75 pan head screw …

Installing the 2 Tower Light Kit or the 3 Tower Light Kit
Installing the 2 Tower Light or 3 Tower Light Kits
Assembly Instructions SIPLACE E 39
Step 2:
► For 2 tower light kit, align the clear LED (1) on top of the green LED using the two key slots on the
PCB.
► For 3 tower light kit, align the orange and red LEDs (1) on top of the green LED using the two key
slots on the PCB.

Installing the 2 Tower Light Kit or the 3 Tower Light Kit
Installing the 2 Tower Light or 3 Tower Light Kits
40 Assembly Instructions SIPLACE E
Step 3:
► Secure the 2 tower light with the provided M4x75 pan head screw (1).
-Or-
► Select the 3 tower light with the M4x105 pan head screw (2).

Installing the 2 Tower Light Kit or the 3 Tower Light Kit
Functional Verification After Installation
Assembly Instructions SIPLACE E 41
3.4
3.4 Functional Verification After Installation
Functional Verification After Installation
► Power up the machine.
► On the main screen, click the icon.
► On the Parameter page Machine input/output, select Green/white indicator lamps (dual sided) for
the 2 tower light kit installation at location 2.
-Or-